JLU-SPH - iGEM 2026

LOADING

Preparing the experiment...

ByeGerm mascot presenting an entrepreneurship laboratory and field-testing platform beneath a starry sky
Engagement

Entrepreneurship

Customer-ledEvidence-backedReady to scale

Table 1–2 · Byegerm Business Model Canvas · Nine modules

Business Model: Overview

If Table 0-1 offers a quick read, this Business Model Canvas brings Byegerm’s commercial logic into one view. The nine modules show how the project creates value, delivers it to frontline institutions, and sustains growth.

Each block connects to the chapters that follow: customer segments to Chapter 2; the value proposition to Chapter 3; key activities, resources and partners to Chapters 4–5; and costs and revenue to §5.5.

Create Deliver Capture
KP
Create

Important Cooperation

  • Microstream control chip ODM/assisting agents in Shenzhen, Suzhou and Ningbo
  • RPA, Cas12a enzyme and crRNA reagent suppliers, with domestic and imported dual supply locked through three-year step-price agreements
  • Tri-Ala hospital testing and respiratory departments, plus municipal CDCs, for clinical and sentinel validation
  • IVD registration and quality-system consultants
  • Regional medical-device distribution and training partners
  • Medical-waste disposal agencies
  • iGEM community and scientific institutions
KA
Create

Key Operations

  • Develop the RPA–CRISPR/Cas12a response system and multiplex panels
  • Engineer microfluidic cards and portable equipment
  • Train the AI interpretation model and iterate the app/dashboard
  • Build the NMPA registration and ISO 13485 systems
  • Establish sentinel SOPs and training certification
  • Fuse desensitized data for public-health early-warning services
KR
Create

Core Resources

  • A four-factor moat: RPA–CRISPR, microfluidics, AI and human-centred design
  • Validation assets from 1,300+ questionnaires and 30+ expert interviews
  • Two-point SOP assets and education-channel assets
  • Core patents, software and trademark assets
  • Interdisciplinary teams and expert networks
VP
Value

Value Claim

A combination that resolves the speed–information–operability trade-off.

  • 25–30 minsample to result
  • 200 copies/mLdetection limit
  • 5 pathogensin parallel
  • Frontline-readyoperable by non-professionals

Results translate directly into on-site diversion, isolation, referral, retesting and public-health early-warning decisions.

CR
Deliver

Client Relations

Standardized training and certification lower the threshold for use.

CH
Deliver

Channel Access

An app with a dashboard acts as the digital delivery and renewal portal.

CS
Deliver

Client Breakdown

High-risk institutions, including eldercare facilities, kindergartens and care centres.

C$
Capture

Cost Structure

Cumulative pre-commercial investment of approximately $45.5 million (2026–2029; year by year 380/620/1,450/50/100; see §5.4), including $30–8 million in compliance costs for registration tests, clinical certification, third-party testing and ethical review.

R$
Capture

Source of Income

  • Testing cards plus repurchase of sampling materials account for 70%.
  • In the baseline scenario, consumables’ share of revenue rises from 49.9% in 2030 to 81.9% in 2034.

Use this canvas together with Table 0-1: one answers what the project is and which indicators matter; the other shows how Byegerm continuously creates, delivers and captures value.

Byegerm venture brief

From laboratory prototype to frontline infrastructure.

A human-centred intelligent POCT sentinel platform for respiratory pathogens, shaped around the needs of care institutions, primary healthcare and public-health teams.

25–30 min200 copies/mL5 pathogens1,300+ questionnaires

1. Executive Summary

1.1 Project Overview

Table 0-1. Byegerm Key Information at a Glance.

DimensionKey Information
ProblemEarly respiratory infections present similar symptoms but require very different responses; frontline settings lack rapid, multi-pathogen, actionable screening tools.
Solution / MVPA minimum viable system comprising a disposable microfluidic test card, portable reader, AI app, and scenario-specific SOPs.
Value PropositionA combination of speed, information depth, and operational usability that neither antigen testing nor centralized multiplex PCR can deliver alone.
Core Performance Metrics (Laboratory Stage)Sample-to-result time of 25–30 minutes; LoD of 200 copies/mL in buffer; five-pathogen parallel detection; inter-batch CV <5%.
TargetsInfluenza, COVID-19, RSV, hMPV, and Streptococcus pneumoniae (4+1).
Initial Beachhead MarketEldercare facilities, kindergartens, primary-care facilities/fever clinics, and prefecture-level CDC sentinel sites.
Market SizeTAM: approximately RMB 13 billion; SAM: approximately RMB 2.5–4.0 billion/year; SOM (2032): approximately RMB 50–200 million/year.
Customer Validation1,300+ questionnaires, 30+ expert interviews, and two pilot sentinel institutions with testing embedded in their morning-screening workflows.
Stages and FinancingPhase I—Validation (2026–2027) → Phase II—Translation (2028–2029) → Phase III—Deployment (2030+). Four milestone-based financing rounds: Seed RMB 7 million → Seed+ RMB 8 million → Pre-A RMB 30 million → Series A RMB 100 million, totaling RMB 145 million.
Financial Baseline (Base Case)Commercialization begins in 2030. By 2034, revenue is projected at RMB 238.46 million with a 24.4% net margin. Accounting break-even corresponds to 276–490 installed units in active use, and operating cash flow turns positive in 2034 (§5.6).
Exit PathIndustrial M&A is the base-case exit route (P/S 3.5–6.5×); the Beijing Stock Exchange is the preferred IPO route; and the STAR Market is an upside route triggered when data-service revenue reaches at least 25% of total revenue (§5.7).
Top RisksThe registration timeline (1.5–3 years for Class II/III IVDs) and cash pressure (a peak cumulative cash shortfall of RMB 83.35 million in the base case) are both high-probability, high-impact risks that require early mitigation.

Byegerm is a human-centered intelligent POCT sentinel platform for respiratory pathogens. It integrates RPA-CRISPR/Cas12a molecular detection, a closed microfluidic test card, portable hardware, AI-assisted interpretation, and scenario-specific SOPs, enabling non-specialists to conduct rapid, multi-pathogen, interpretable, and actionable on-site screening in eldercare facilities, kindergartens, primary-care facilities, fever clinics, and CDC sentinel sites.

We do not position Byegerm as a replacement for laboratory PCR. Instead, it is an on-site complement that extends molecular-testing capability from central laboratories to frontline settings, allowing results to inform triage, isolation, referral, and public-health warning workflows earlier. Interviews with experts, including Dean Li Juan of Jilin University’s School of Public Health and specialists from the Beijing CDC Institute for Infectious CDC, repeatedly highlighted two needs: sample-to-result within 30 minutes, and one-test multi-pathogen screening that is both rapid and usable by non-specialists. Byegerm’s core specifications—a 25–30 minute sample-to-result time, an LoD of 200 copies/mL, and parallel screening for five pathogens—were designed backward from these real-world requirements.

The market window is substantial. The global POCT market was valued at approximately USD 31.1 billion in 2023 and is projected to reach USD 43.2 billion by 2026, representing a compound annual growth rate of about 11%. Within that market, infectious-disease POCT was approximately USD 11.4 billion in 2023 and is projected to grow at a 4.3% CAGR from 2024 to 2030. China’s POCT market has grown at nearly 20% annually over the past six years and is expected to exceed RMB 23 billion in 2025. To avoid untraceable claims such as ‘multiple sources agree,’ every market figure in this document is tied to a named third-party source: overall global and China POCT data from iResearch and Guolian Securities research reports; global infectious-disease POCT data from Allied Market Research; molecular POCT segment data from QYResearch; and cross-checks against annual reports from listed companies such as Wondfo Biotech and other industry estimates. The original source, base year, and scope for every figure are listed in §2.5.2, Table 2-2, and Figure 2-1, with links to the underlying reports supplied for review and audit in the final submission.

1.2 UVP — Unique Value Proposition

1.2.1 UVP Statement

Byegerm is an intelligent POCT sentinel testing platform for respiratory pathogens designed for eldercare facilities, kindergartens, primary-care facilities, fever clinics, and CDC sentinel sites. By combining RPA-CRISPR/Cas12a, a closed microfluidic test card, AI interpretation, and scenario-specific SOPs, it enables non-specialists to complete multi-pathogen screening within critical time windows and translate results into on-site triage, isolation, referral, retesting, and public-health warning decisions.

1.2.2 UVP Formula

We use the classic ‘For [target users]—who need [need]—our product is [category]—that provides [benefit]—unlike [alternative]—we enable [differentiator]’ framework, allowing any stakeholder to examine, validate, or challenge the value proposition:

Table 1-1. Byegerm UVP dismantling.

UVP ElementsBygerm Symmetry
Foreldercare facilities, kindergartens, primary health-care institutions, fever clinics, CDCs
Who needRapid, actionable, on-site deployable respiratory pathogen screening Cha.
Byegerm ishuman-centered intelligent POCT outpost detection platform
That providesMultiple Pathogen Molecular Testing, AI-assisted interpretation, SOP and Management Decision Support
UnlikeRapid but limited-information antigen testing, or quasi-dependent laboratory PCR
We enableNon-professionals complete testing on site and conduct rapid diversion, isolation, referral and early warning

1.2.3 Why Customers Would Choose Byegerm

The underlying reason for client selection is that it provides a combination of existing solutions that cannot be balanced in the speed-information-operability triangle. An antigen test can produce results within 15 minutes, but usually only covers a single target and has limited sensitivity; The central laboratory PCR can be as sensitive as 103 copies/mL, but it often takes 4-24 hours from delivery to results. Byegerm completes multi-pathogen parallel tests within 25-30 minutes, with a floor limit of 200 copies/mL and increases the degree of resistance of the host DNA to 100 times the background concentration common in the clinical matrix through magnesium acetic acid dripping and closed reagents in the response system - which means that, in the first case of fever, a nursing home can obtain a five-column result on influenza, the COVID-19, RSV, HMPV, and pneumocococcus during a midday break, without having to wait hours or even days.

In terms of unit price-value ratios, based on the typical cost structure of the existing IVD industry, a single antigen was detected at a cost of about $5-8 and a single project PCR of about $30-60; while multiple PCRs of respiratory tracts generally cost between 200-500 dollars. By size, the five-message material of Byegerm is measured and the target terminal price is expected to be anchored at a single level of $80-120 to enable it to establish a clear value belt position on "antigens, multiple PCRs".

1.3 Entrepreneurship Logic

The entrepreneurial logic of Byegerm can be summed up in one sentence: to translate the engineering capacity of iGEM synthetic biology into the capacity of the "field molecular sentry" that is most needed by the grass-roots public health system, but most difficult to build. This logic is supported by three layers.

First, the demand layer. Our clients found (detailed in chapter 2) that the true pain point of respiratory infections was not "quantified" but "timely measured, on-site and actionable". Second, the technical layer. The RPA Heat Increase, CRISPR/Cas12a signal amplification, closed microfluidic, AI interpretation of these four independently validated technologies were first integrated into a non-professional closed system. Third, the institutional layer. We use the NMPA II/III IVD registration path as the anchor for compliance, with both eldercare facilities and kindergartens as anchors for validation, with "Equipment Infiltration + Usage Repurchase + Data Services Subscribe" as commercial sustainable anchors for conversion of "one-time projects" into long-term operational infrastructure.

Commercially more critical is that, at this stage, the market for the detection of respiratory pathogens in China is still growing at more than 25 per cent per annum, but the in-house market has been divided by the head IVD depths of Roth, Yape, Dannach, BioMérieux, St. Vincent's Biology, and Dan's Genes; and the scene of the Grassroots + Institution is still blank. Byegerm's business logic is therefore not "Face-in-the-house PCR market", but "to get into unserviced out-of-house scenes and complete business closure during the PESTLE windfall."

2. Potential Customers and Unmet Needs

2.1 Problem Background

The challenge for respiratory infections is that it is both an individual health problem and an institutional management problem, and more so a public health problem. Influenza, RSV, COVID-19, hMPV and bacterial respiratory infections may be highly similar in early symptoms, but the subsequent treatment path is different: Some need to be segregated, some need to be referred, some need to be retested, some concern the rational use of antibiotics and some may trigger public health reporting.

The global burden of disease illustrates the magnitude of the problem. According to WHO, seasonal influenza causes about 1 billion cases per year, including between 3 and 5 million serious cases and between 290,000 and 650,000 respiratory deaths; Epidemiological studies also show that hMPV can cause a significant burden of hospitalization among children under 5 years of age and those over 65 years of age, but is chronically underestimated because of insufficient testing. According to our interview with Vice-President Kiirin, Vice-President of the College of Public Health of the University of Jilin, "the virus's combined bacterial infections are common, but the logic of treatment is completely different: bacterial infections require antibiotics, and viruses are not." This observation leads us directly to multi-target designs of 4+1 (influenza, COVID-19s, RSV, hMPV+ pneumococcal). [S1] [S2]

In nursing homes and kindergartens, this risk is further magnified. In the event of concentrated fever and coughing, institutional managers are often limited to conservative measures such as limiting visits, suspending class activities, notifying parents, concentrating on referrals or waiting for out-of-country testing. These measures, while prudent, may lead to operational stress, family anxiety and waste of medical resources. The director of a nursing home we visited said, "The common cold of an old man, if the cause of the disease is not identified in time, is likely to turn into respiratory infections on the entire floor within a week," which is the very starting point of our project.

Existing detection paths are clearly fractured in real grass-roots scenes. Antigen testing is fast enough and cheap enough, but often the amount of information is limited to support multi-pathogen diversion; Laboratories PCR are highly accurate, but relying on sample trans-shipments, professionals and laboratory equipment often cannot return results within key windows of site diversion. WHO also noted that other respiratory virus infections may be characterized by influenza symptoms, making clinical identification difficult; Although widely used in clinical settings, rapid diagnostic tests are generally less sensitive than RT-PCR and reliability is affected by conditions of use. [S1]

2.2 First Potential Customers

We divided the first potential clients into three categories. This classification is not based on industrial inertia, but on "the pain intensity of rapid multi-pathogen screening" - the stronger the pain, the higher the willingness to pay, the lower the resistance to deployment.

2.2.1 High-risk agency clients

Including nursing homes, kindergartens and nursing institutions. These scenes are densely populated, with older persons and children belonging to groups at high risk of respiratory infections, and managers need to quickly determine whether to isolate, refer, notify their families or adjust operational arrangements. According to the Ministry of Civil Affairs, Annual National Ageing Development Bulletin 2024, by the end of 2024, the population of persons aged 60 years and over had reached 310 million people, or 22.0 per cent of the total population, and had officially entered a medium ageing phase; the China Centre for Population and Development Studies projected that the population of older persons in 2025-2030 would grow by a net annual average of 3.09 million to 390 million. At the same time, the total number of places in the national pension service is planned to reach more than 9 million in 2025, and the size of the institutional pension market is expected to exceed 50 billion yuan. In our special questionnaire for 755 old-age care workers, the most high-frequency pain point is "the onset of fever without rapid diagnosis of pathogens". [S3] [S5]

(b) Data from the AIDS Counselling Service show that China's infant and child care market was 15,181 million yuan in 2024 and is expected to climb to 23,231 billion yuan in 2030. "A total of 4.5 places per 1,000 population for children under three years of age" is a hard indicator at the end of "1450". There is a strong institutional demand for "parent-explainable, reset" visual screening tools.

2.2.2 Primary care and fever clinics clients

These include community health service centres, primary health-care facilities and fever clinics in level II hospitals. These scenes require quick completion of the primary screening, easing the stress of access, reducing unnecessary waiting, and providing doctors with more pathogen-directed supporting information. In our interaction with the Director of Hospital Inspections, it was repeatedly stressed that "The equipment on the ground must be a fool's operation, and the results must be read intuitively, as shown by the red and green light, and that the one-time detection of various pathogens is important for identifying diagnosis and precision control" -- feedback that directly shapes Bygerm's red and green light UI and the Five Test Designs.

In the light of the system, the National Commission on Health and others, among others, provide guidance on the overall promotion of a strong district health community. (a) Make it clear that by the end of 2025, more than 90 per cent of the country's counties (municipalities) will have almost completed a close district medical community, with almost full coverage by 2027; This opens a clear procurement window for Byegerm ' s equipment in the district level diagnostic system. [S4]

2.2.3 Clients at public health posts

These include district and city-level CDCs, community posts and screening sites. Such clients are concerned not only with single tests, but with regional trends, abnormal concentrations and early warning. In our interview, the Deputy Director of the Beijing Institute for CDC and Infectious Diseases made it clear that "detection equipment cannot be an island of information, and result data should be easily and safely accessible to existing infectious disease surveillance networks to support real-time early warning, epidemic trend analysis and control decision-making. "This directly drives the data architecture of Bygerm, "De-sensitization aggregation-sitting."

The "Health China 2030" programme outlines the improvement of early warning mechanisms for the surveillance of infectious diseases" and the "establishment of a system for the prevention and control of infectious diseases at the port of entry for the intelligent monitoring of infectious disease messages worldwide", with precision quarantine; and the 2023 "Professional Medical Quality Control Indicators for Infectious Diseases (2023 edition) further calls for a qualitative test of the "pre-pre-pre-pre-pre-prevalence and positiveness of influenza pathologies for the use of anti-influenza drugs", making the "pre-pathological diagnosis, after-use drugs" institutionalized. This means that on-site molecular tests at the end of the outpost move from "optional" to "necessary". [S6] [S7]

Thus, the first round of Byegerm is not a general "market for all respiratory tests" but: eldercare facilities + kindergartens + primary care/fever clinics + prefecture-level CDC sentinel sites. This is the best combination of pain, accessibility and replicability.

2.3 Customer Discovery and IHP Evidence

Our clients found that the product was not market-packed after completion, but that it was integrated into Designing and Integrated Human Practices at an early stage. The table below summarizes the core client findings we have completed, and all figures and references can be traced back to original interview records in IHP Wiki.

Table 2-1. Summary of customer findings with IHP evidence.

Client detected actionSample volume/objectKey findingsDirect impact on products
Community public health questionnaire385 valid questionnaires covering age groups45% of the population aged 31-50 with family care responsibilities, with a general sensitivity to respiratory health at all ages degreesIdentification of the "old and small" market location and portable testing needs for the home scene.
Specific questionnaire for nursing workers755 nursesHigh frequency pain points are "complicated operation", "explained liability" and "disposal concerns".Drives the magnetic suction caps, lollipop samplers, the in-situ self-destruct and the destruction of the three cores.
Interview with the dean of a nursing home20+ InstitutionsManagers are most concerned about the operational and emotional stress of "one size fits all"Set up a "field diversion" instead of "laboratory substitution".
Retrospective interviews with patients during recovery.200 valid questionnairesNinety-five percent of them think "full-screened block" is the result interface that they most want to see when they have a fever; 92 percent means "automated lock" to reduce anxiety.Lock in the red and green light. UI and the associated self-destruct mechanism.
Old people blindly vote.102 elderly personsUnder conditions that are not dependent on eyesight, 89% of the elderly put the wood in the good use box.Multiple Sensory Compensation Design for Confirming Throat + Touch Feedback
Expert interviews30+ expertsCoverage of areas such as CDC, epidemiology, testing, infection, breathing, electronics, AI, ethics, regulation, industryKey design decisions such as the formation of a group of five pathogens, the RPA-CRISPR technical route, closed tube testing, CV < 5% industrial recovery

These numbers answer the same question together: Bygerm is not "we want to do," but "they tell us we have to do."

2.4 Unmet Needs

Through clients, we have found that our decentralized feedback system has been translated into six categories of unmet needs. Each category has both the characteristics of "high pain" and "no existing scheme can cover".

On-site rapid decision-making needs: the agency needs to decide within minutes whether to isolate, refer or retest, rather than waiting for the results to be delivered.

Information needs for multiple pathogens: Respiratory symptoms are similar, but pathogens differ and management strategies vary. Single or low-level information detection is difficult to support fine-tuning diversion.

Non-professional operational needs: Care workers, teachers and grass-roots staff are not likely to receive the same complex training as those in the testing section, so the system must be simple, closed and oriented.

(b) Children may be afraid to swallow. Products must fit real users, not just laboratory personnel.

Boundary needs for biosafety and liability: Agency concerns about infectious waste, liability for miscalculation, interpretation of results and parent communication.

Public health data needs: CDC requires not just isolated detection results, but sentinel data that reflect trends and unusually high concentrations.

The six types of demand form a "demand-design" map, each of which corresponds to the specific engineering actions of Bygerm (which are carried out in chapter 3 in the context of chapter 3).

2.5 PESTLE Analysis

To judge the external opportunities and commercialization constraints of Bygerm, we use the PESTLE framework to analyse its macro-environment. In this section, we deliberately dismantle each dimension into a three-part "Specific Policy/Data - Business Meaning for Byegerm - Strategic Action", so that PESTLE is not a static description, but a basis for commercial judgement that can be subject to external audit.

2.5.1 Political (political and policy environment)

China ' s public health and primary health-care system is currently undergoing a structural expansion, with top-level policies opening the procurement window for grassroots POCT checkpoints:

The Programme Framework "Health China 2030" states: "To improve early warning mechanisms for the surveillance of infectious diseases" and calls for "the establishment of a system for the prevention and control of infectious diseases at ports of entry with a global intelligence system for the surveillance of infectious diseases, which is accurate and quarantined". [S6]

Close county medical community construction (2023) No. 41: Require that by the end of June 2024, province-wide roll-out is required, that by the end of 2025 more than 90 per cent of districts (municipalities) in the country will have been built up and will be covered in full by 2027, and that the county health insurance fund 's "Pay for Packing + Total Advance" mechanism will allow for a significant upward movement in district procurement decision-making and preference for on-site testing tools that reduce hospital/referral costs.

In 2025, priority was given to the Integrated Health and Hygiene Pilot Zone at the grass-roots level: village health homes and community health service centres were required to have full coverage of district hospital staff, to provide full coverage of children's common diseases, and to "do an old, old and small health management service" - the "old and young" is the beachhead market of Bygerm.

Specialized medical quality control indicator for infectious diseases (2023 edition): the inclusion of "pre-influenza pathogen diagnosis positive" in the medical quality control indicator, making "pre-diagnostic, post-infection" a physical constraint at the institutional level. [S7]

(b) The 15th Recommendation further clarifies the direction of the silver economy as a priority sector, which is expected to increase from 6% to 9% of GDP in 2035.

Business implications for Byegerm: Together, the policy constitutes a "basic rich, human, targeted and accountable" procurement environment. Byegerm does not need to bet on a new policy, but is able to "take a ride" into an open district medical community, an old and small health management, infectious disease quality control, and four procurement routes for surveillance of communicable diseases.

2.5.2 Economic (economic and market size)

In terms of market size, POCT and infectious disease molecule diagnosis have continued to show high growth over the past decade, and the break-in track that Byegerm enters is in the best commercial window of "large, high growth, low concentration, blank bandwidth":

Table 2-2. POCT market size stratification (multi-source cross-check) associated with respiratory pathogen testing.

Market layerRecent size (base year)Expected size / rate of increaseData sources and calibres
Global POCT General Market (TAM ceiling)Approximately $31.1 billion (2023)2026 About $43.2 billion; 2023-2026 About 11% CAGRIri Consulting; Confederation securities
Global POCT Molecular Diagnosis$5.683 billion (2023)2030 $10.13 billion; 2024-2030 CAGR approximately 9.6 per centQYResearch
Global Infectious Diseases POCTApproximately $11.4 billion (2023)2024-2030 CAGR around 4.3%Allied Market Research
China POCT General Market (SAM ceiling)CAGR 20%In 2025 about 23.14 billion yuanIri Consulting; Marv Biological Annual.
Infectious diseases in ChinaAbout $20 billion (2023)2023-2027 CAGR around 9.8%United States securities;Allied Market Research
Intra-respiratory pathogen (SAM core)1297 million yuan in 2019In 2028, about 10.1 billion yuan, of which 8.4 billion yuan is for molecular detection;Weekly issues of the securities market; industry measurements
Chinese institutional pension marketBed target 9 million sheets (2025)The market size in 2025 was about 54 billion yuan.National Commission for Development and Reform; "XIVV" pension scheme
China Infant and Child Care Market$151.81 billion (2024)In 2030, about 23.231 billion yuanAIDS counselling
Figure 2-1. POCT market size related to respiratory pathogen detection (multi-source cross-checking; column indicated as corresponding base year/project year).

Business implications for Byegerm: Bygerm does not need a gambling track growth, and the entire upstream track has entered double-digit growth with multiple drivers of policy, population, technology. But Byegrem can't use $8.4 billion for the SAM - a market that has been enriched by the blue sea of Roth, Yape, Dannach, BioMérieux, St. Vincent, the Daane Gene, Booch Cricket, Zhuang Huisheng, Helsch, etc.

Strategic Actions: Before § 3.6 SWOT, use the TAM/SAM/SOM three-layer funnel to anchor the market size as "the market we can really compete for" and avoid over-optimizing the size of the total market.

2.5.3 Social (social and demographic structure)

Deep ageing: According to the Ministry of Civil Affairs' 2024 National Bulletin on the Development of Ageing, 310 million people (22.0 per cent) were aged 60 years and over, and 220 million (15.6 per cent) were aged 65 years and above. The Centre for Population and Development Studies of China projects a net annual increase in the older population from 320 million to 390 million people and an ageing rate from 22.8 per cent to 27.7 per cent in 2025-2030.

(b) The size of the silver economy market reached 15.8 trillion yuan in 2025 (White Paper on the Silver Economy 2025).

(a) Structural needs for birth and care: In 2023, the number of newborns dropped to 9.02 million, but fertility policies combined with inclusive care programmes have reinforced the willingness to pay for the health of "minus and lean" children;

Urban and rural level consultations: The needs of district residents for "homeside testing" are highly correlated with the cost constraints of the county medical community's "total fee" - "lower referral, early diversion" is the core KPI for district administrators.

The commercial meaning of Byegerm is not only a policy slogan, but also a consumption-system composite market with clear capacity to pay, clear institutional entry, and clear regulatory pressure. Byegerm's "Ageer+Care" double-posted resonance with the social and demographic structure.

2.5.4 Technology (technology maturity and industrial chain)

(b) The 2024-2025 Review (PMC, etc.) indicated that the CRISPR + isothermal amplification (RPA/LAMP) had been achieved by ≤30 minutes, 10^2 copies/mL scale sensitivity to the next generation POCT technology. [S8] [S9]

microfluidic industrial chain nationalization: microfluidic materials and abbreviations such as PDMS, COP, COC have developed in the country a mature generation of industrial ecology (Shenzhen, Suzhou, Nimbardo ODM), and single-card BOM costs can be contained between 15 and 30 metrozones, making it possible to "hardware penetration plus repurchase" business models.

AI marginal interpretation hardware matures: AI SoC from Sichuan, Cold Wu, has supported the lateral YOLOv8 reasoning; cost of effort and price can be close to ARM Cortex-M level MMU.

Trends in multiple pathogen screenings: the integrated solution of the Manfon biorespiratory tract, Zhue Xianxiang, and the Zhue Xianxian Zhuong Zhui Zhuong Zhui Zhui Zhuong Zhui Zhui Zhui Zhui Zhui Zhui Zhui Zianhu Zhui Zhui Zhu Zhui Zianhu Zhu Zhui Zhui Zian Zhu Zhu Zhui Zian Zhu Zhu Zhu Zhu Zhu Zi reagent box are on the market, indicating that clinical recognition of multiple tests has been validated - this is an advantage for Bygerm to "pay the costs of education".

Business implications for Byegerm: It's not "can bet technology work," it's "for the first time we've integrated the technology that we can already use into the grass-roots scene." Technical risks have been mitigated early, but the integration and engineering risks remain self-sustaining (see § 3 and § 4.4 for details).

2.5.5 Legal (Law and compliance)

NMPA IVD Registration Path: Registered under the Measures for Registration and Recording of In vitro Diagnostic Reagents (Order No. 48 of the General Directorate of Market Supervision) and Medical Devices Registration and Recording (Order No. 47 of the General Directorate of Market Supervision), Category I, Category II/III. Byegerm Multiple Nucleic Acid Detection reagents for the V pathogen fall in categories II or III; Hardware equipment is also to be declared separately according to the medical equipment classification rules. [S11] [S12]

Registration cycle and cost: routine II for exemption from clinical trials The typical three project cycles are 1 to 1.5 years; Projects requiring clinical trials (multi-centres, more than 3 clinical institutions) are usually 2 to 3 years, and registered tests + clinical trials + the total cost of system verification is usually between 3 and 8 million yuan (industry experience).

Quality management system: The technical requirements for YY/T 0287-2017 (equivalent to ISO 13485) and for the production of medical devices (YY/T 0287 + GMP) and category III IVD products require that the main raw materials and production processes be identified in appendix form. [S13]

Data compliance: The Personal Information Protection Act, Data Security Act, Information Security Technologies, Health Medical Data Security Guidelines (GB/T 39725), together constitute a compliance base for health data; [S14] [S15] [S16]

Advertisement and declaration of boundary: under articles 16 and 18 of the Advertising Act and the Criteria for the Review and Publication of Medical Devices, the IVD product cannot claim to be "a substitute doctor's diagnosis"; Byegerm must use the term "preliminary screening/auxiliary" and retain clinical review. [S17]

For the commercial meaning of Byegerm: Compliance is not an ancillary process of "product formation and reprocessing" but rather a process from the design input stage, i.e. impact: 1) the selection of categories for registration, 2) the retention of processes and raw materials files, 3) the data architecture and privileges model, 4) the marketing of narratives and training content. Bygerm plans to introduce IVD registered consultants at the end of Phase I to synchronize the builder development document (DHF).

2.5.6 Environmental (Environment, Biosafety and ESG)

(b) The Medical Waste Management Regulation requires the central disposal of infectious waste within 48 hours, with significant compliance costs for grass-roots institutions. [S18]

ESG and procurement preferences: ESG ratings are being introduced in the procurement reviews of conglomerates, local state enterprises and some head-linking/care institutions; Light quantification, self-destruction, recyclable casings, low energy consumption designs are significantly more detailed.

Biosafety liability: The Biosecurity Act makes it clear that the institution is responsible for the entire process of infectious samples and waste, and that what is most feared at the grass-roots level is not the cost of testing, but the "misuse is being pursued".

Business implications for Byegerm: Environmental dimensions are not ethical requirements, but rather procurement subdivisions and liability risk buffers. Byegerm directs closed card boxes, in-situ self-destruction of sodium hypochlorate, modularized light transport, and standardized agreements with third-party medical waste disposal agencies into the SOP, which translates ESG and biosafety risk visibility into product differentiation points.

2.6 Market Sizing — TAM / SAM / SOM

In order to avoid over-optimizing the size of the market, we use the classic TAM/SAM/SOM three-layer funnel to further reduce the total market volume referred to in PESTLE to "the real contestable market of Bygerm".

Figure 2-2. Byegerm TAM / SAM / SOM market funnel.

2.6.1 TAM — Total Addressable Market

TAM is defined as the theoretical upper limit "if all relevant respiratory pathogen tests are completed in China 100% by Bygerm". Based on the projected scale of respiratory pathogen detection in the Chinese compound for 2028, about RMB 10,110 billion, the size of the Chinese infectious disease IVD 2027 about RMB 28 billion (20 billion x 1.098^4) and the estimates of out-of-home locations (alienage/care/grass-roots 5400 + 15,180,000 million spent on health) the TAM ceiling is as follows:

Calculator: TAM Byegerm, 2028 about $10.1 billion (in-house) + $3 billion (respiratory channels related to out-of-house posts) about $13 billion

2.6.2 SAM — Serviceable Addressable Market

SAM subsegregation of genuinely accessible Bygerm - Old Age Homes, Kindergartens/Cares, Primary Health Care (Community Health Services Centres + Town Health Centres), Secondary Hospital fever clinics, District and Municipal CDC Postes, and exclusion of the Centre ' s 3A Hospital PCR market. We're using the "number of institutions x annual frequency detection x unit price" to remodel from bottom up.

Estimated by conservative calibre (50% institutional end configuration rate, 0.5 screenings per person per year, single price of $100):

Calculator: SAM approximately (4,000 text million institutionally covered people) x 0.5 x 100 yuan approximately 20 text billion yuan/year

In 2028, the overall SAM was conservatively estimated at 2.5-4 billion yuan.

2.6.3 SOM — Serviceable Obtainable Market

SOM is the realistic market share of Bygerm in Phase III (2030-2032). Based on the typical five-year municipal share of IRD start-up companies, 1 to 3 per cent (references to early shares of target companies in the same period of time, e.g., Botonics, Zhuang Huisheng, etc.) and combined with the differential positioning and channel-building rhythm of Bygerm:

Calculator: SOM text2032 about SAM x (2% – 5%) about 0.5 – 2 text billion yuan/year

This zone is not "surprising" but it is enough to support a small batch of IDD start-up companies reaching a positive operating cash flow in Phaase III and constitute the valuation anchor for the next round of strategic financing.

From the bottom up, independent validation: § 5.6's financial model is not based on market aggregates, but is cumulative year by year with "a single annual card consumption x a single card terminal price" based on a baseline scenario of $52.06 million in operating income in 2032, or approximately $5.2 billion, just below the SOM zone. The two approaches are completely independent -- one from top to bottom, one from bottom to bottom, and one from bottom to bottom, and then to the same zone. This cross-certification indicates that SOM measurements are not too high and that the financial model takes a conservative end between SOM sectors.

2.6.4 Clarification as to why the three layers are decreasing rather than incremental

A common hunch in the review is that the TAM/SAM/SOM three tiers should be incremental, such as from the Jilin province to the national and international levels, and on a growing scale. There is a need to clarify a very confusing concept: TAM/SAM/SOM is a deliberately designed "value-drinking funnel", not a "geographic expansion ladder". The funnel answered the question "How much can we really compete at the same point in time (e.g. 2028) from the theoretical disk" and therefore inevitably decreases from one level to the next: TAM (about $13 billion, all related tests) ⊇ SAM (about $2.54 billion, outside the courtyard + serviceable part) ⊇ SOM (about 0.5 billion to 200 million dollars, a realistic share for start-ups over five years). Declining is precisely the purpose of this methodology -- to prevent the use of "large total market" to cover up "very little we can really get."

Intuitively, the incremental relationship between the "Gilin Province" and the "National International" is real, but it describes another dimension -- the expansion of geographical coverage at any time, corresponding to the three phases of the § 4.1 road map, rather than the market segment at the same time. In order to avoid confusion, we have translated this incremental geographical logic into a separate figure of 2-3: Byegerm, with Jilin province (group location, start-up outpost) as Phase I-II as the base for validation, copying to the Long Triangle, Kyouta, Chengzheng, and expanding the network of local and municipal outposts throughout the country, after 2032, to make international adaptations to low-resource areas such as South-East Asia and Africa. So the funnel decline is not in conflict with the "geographical increase," but the same business plan has two positive views on the "share dimension" and "geographic dimension."

Figure 2-3. Byegerm geographical market expansion ladder (incremental geographical coverage, distinct from TAM/SAM/SOM values funnel at the same time point).

3. Feasibility, Scalability and Inventivity

3.1 Scientific and Technical Feasibility

Bygerm's technical route revolves around "workable on site" rather than "highest laboratory complexity". Our interview with Professor X. Chris Le of the University of Alberta directly helped us to move from the original PCR approach to the RPA-CRISPR route - "It is feasible to use PCR in conjunction with CRISPR for scientific research in the laboratory, but your goal is to develop portable equipment at the port site, which is a completely different technical selection logic" - a sentence that determines the entire hardware shape of Byegerm.

In particular, the RPA constant isothermal amplification (37-42°C) makes nucleic acid expansion less heavily dependent on complex temperature-controlled cycles and more suitable for portable equipment and ground-level sites, with single expansions usually 15-20 minutes. CRISPR/Cas12a identifies the target sequence through crRNA and creates a signal magnification effect (trans-cleavage) after identification, providing a specific foundation for multi-pathogen detection. microfluidic detection cards integrate sample processing, augmentation, identification and signal output into closed channels, reducing the risk of manual transfer and contamination; We use array-style stand-alone small-room structures to control cross-pollution rates below 0.1%. AI interprets the image recognition of fluorescent signals through a light quantitative volume neural network based on YOLOv8, allowing non-professionals to also obtain standardized results.

Thus, the feasibility of Bygerm comes from four levels:

A bioreaction system is feasible: RPA and CRISPR/Cas12a are suitable for rapid molecular identification and have been validated in several literatures to achieve near PCR sensitivity in 30 minutes.

Engineering integration is feasible: microfluidic card boxes can reduce open operation and pollution risks, and third-party blinding batch mutations CV < 5%.

The process is feasible: App and SOP can guide non-professionals to complete the operation, and 89% of the IHP certifications have achieved a rating rate of 99% for the blind and 94% for the child.

Site deployment is feasible: portable equipment and closed materials are suitable for old age, child care, grass-roots medical care and outposts, and modular transport strategies support "dry and wet separation" to reduce cold chain costs.

3.2 MVP — Minimum Viable Product

Bygerm 's MVP is not a single device, but a minimum viable system: a one-time microfluidic card + portable interpretation device + AI App + SOP. One of these five components is missing -- any missing system is demo, which looks pretty but doesn't work.

This MVP is used to validate five key assumptions, each of which corresponds to specific indicators that have been or will be validated:

Table 3-1. MVP Key assumptions and validation indicators.

Key assumptionsCorrespond to validation indicatorsCurrent Authentication Status
1. Non-professionals are able to complete testing by SOPOld age blind operation success rate, child sample acceptance degreesOld-age blinding 89%.
2. Sufficient test time to support on-site diversionSample to result 30 minutes25-30 minutes under laboratory conditions (verified)
3. Agencies are willing to integrate results into management processesSOS Access RateTwo sentinel homes/kindergartens have been included in the morning screening process (certified)
4. Data can provide early warning to service outposts subject to complianceData access to CDCs compliance pathSimulation data interface installed (validation process)
5. Balance of gains and losses by unit economic modelSingle annual calorie consumption, 350 sheets, radium consumption, 70 per cent (bookbook), LTV/CAC 3 and balance of gains and losses in loaders, 490 unitsThree scenarios financial model completed (§5.6) and single annual card consumption is low

The goal of the MVP is not to achieve a full commercial product at once, but to validate the real scene with a minimum system that is "available, available, buyable, expandable".

3.3 Validation Strategy

Bygerm's verification is moving on three layers of "laboratory-availability-situation". These three layers are not parallel relationships, but funnel relationships: laboratory certifications are "can we run through", usability tests are "can we run through ordinary people", scene tests are proof that the agency can use it as a daily tool.

Laboratory Validation

Laboratory certification is used to demonstrate whether the detection system works. Wiki Add detection time, minimum test limits, specificity, cross-response, repetition, compatibility of different targets and signal interpretation stability. We have optimized the detection floor to 200 copies/mL in the buffer system;

Usability Validation

Validation of usability is used to demonstrate whether a true user can use it. Wiki shows the success of the caregiver completion process, feedback from older users on UI and slides, child acceptance of friendly samplers, non-professional understanding of the outcome interface, and implementation of waste disposal processes. The IHP phase sampled 102 elderly people, 50 children and 200 persons with a alpha-rehabilitation period, resulting in 89 per cent old people ' s rate of positive blindness, 94 per cent children ' s positive mood and 95 per cent full-screen recognition.

Scenario Validation

The scene validation is used to demonstrate whether Bygerm can be converted into a management value. Wiki shows how the results of the tests are used to reduce the time of diversion, how the isolation and referral process is developed in the eldercare facilities based on the results, how the kindergarten informs parents of the results and arranges for a review based on the results, how the results are used in primary screenings in primary health-care institutions, and how the disease management obtains trend signals through aggregated data. Two sentinel institutions (a nursing home and a kindergarten) are now embedding Byegerm into a routine morning screening and an abnormal emergency response process, confirming the viability of the "test-decision-action" closed loop.

3.4 Inventivity — What Makes Byegerm Different

Bygerm ' s creativity is not a single technology point, but a combination of innovation in technology, products, systems and public health logic. We have four levels to illustrate the irreplaceable nature of this combination.

Technical Inventivity

Bygerm integrates RPA-CRISPR/Cas12a with microfluidic closed card boxes, optical reading and AI interpretation to make molecular detection more suitable for on-site screening. Key innovation points at the technical level include: the closed tube response design (reference " All-in-One" approach on Nature Commissions, pre-packaging Cas reporter molecules in tubecapable microbages, released mechanically by pressure, with no open-cover operation at all), array space diversion (reference to CARMEN approach, avoiding multiple RPA quotations in the same tube, light quantitative interpretation model based on YOLOv8 (using AdamW Optimizer and L2 positive, 70/20/10 ratio of training validation tests). [S10]

Human-centered Inventivity

Instead of simply moving laboratory processes into boxes, we are redesigning the interactive approach based on feedback from older persons, children and caregivers:

Magnetic slurry caps: replaces a thin spin button, supports one-hand large motion opening, adapts to a weak or shaking patient;

The big-word contrast UI and the red green light show that 95% of the full-screen high saturated green (safe) or red (alert) colours are considered "the most desired design for fever."

Associated self-destruction and elimination: mechanical puncture of an inner sodium chlorate capsule when the slide lid closes, 92% of respondents say "automated sterilisation locks reduce the anxiety of transmission to their families".

System Inventivity

Bygerm is not a reagent box + instrument, but a system program for "Detecting + SOP + App + Data + Site Process". It connects the results directly to the agency management action, rather than staying on the demonstration of the results. This system innovation is reflected in the "early identification - fast disposal - strong synergy" process in eldercare facilities, as well as child-friendly testing in kindergartens embedded in the morning screening process.

Public-health Inventivity

Bygerm converts the results of a single test into data nodes for potential outposts. In the context of compliance, disaggregated desensitization data can serve to monitor regional trends, expanding products from "diagnosis tools" to "part of public health infrastructure". This innovation in the dimensions of public health was directly confirmed by the expert interview with the Beijing Institute for CDC and Infectious Diseases as "must" - "detection equipment cannot be an information island".

The above-mentioned four layers of creativity together constitute a differentiated moat of Bygerm. But the moat has to be replicated to be commercially meaningful.

3.5 Scalability

The scalability of Bygerm comes from both product structures and business models.

In product structures, samplers, detection cards, equipment, App and SOP can be reused in different scenarios. Different pathogens can expand according to customer needs, from basic respiratory tracts to more complex CDCs, Panel - technically, this only needs to replace the crRNA with the quote, and hardware and software need not be significantly modified.

In the business model, hardware equipment can be used as an entry point into the institutional scene, repurchases of reagents and consumables are tested, and income from the Apple Advanced functionality, data visualization, equipment maintenance and training services are generated. This complex model of "hardware penetration - repurchase of materials - subscription to services" is more suitable for long-term service and regional expansion than for selling only one-time equipment. In combination with typical data for the IVD industry, hardware sales are usually 35-45 per cent, materials-consuming-maorily, 55-70 per cent, SaaS/data subscriptions 70 per cent; Byegerm takes 40 per cent of equipment, 70 per cent of materials, and 87 per cent of data and services in the financial model (§ 5.6.1). This means that the overall Māori structure will improve year after year with the increase in the ratio of materials to services - the ratio of revenue from materials under the baseline scenario rose from 49.9 per cent in 2030 to 81.9 per cent in 2034 and the combined Māori ratio from 58.4 per cent to 68.1 per cent (see § 5.5 and § 5.6 for details).

Through channels, Bygerm can establish pilot cases of poles through direct marketing and cooperation, and expand coverage through regional distributors, CDC projects, medical communities and public health procurement. The Education chapter, which provides a unique "first-to-first-education-to-sell" channel for the cognitive preparation of clients in follow-up institutions, has established a general contact point with more than five categories of people in high demand and three categories of people with special needs -- a resource that most IVD start-ups do not have.

So, the typegerm extension path is not "immediately national," but rather: small-scale whistle-point validation, pole-replicating, regional channels to build multipathogens, panel extension, public health data networks.

3.6 Competing Landscape

Before entering SWOT, we used the standard competitive analysis framework to break the Byegerm competition into three categories of "direct rivals, indirect rivals, potential rivals" and avoid the abstraction of the threat in SWOT. The three categories of criteria are: the direct competitors provide a "field/rapid pathogen detection" value that overlaps highly with Byegerm; the indirect competitors meet the same needs in different ways ("know what pathogen"), but in different forms; and potential competitors are not currently on the tracks at the base, but are capable of sinking or cross-border entry at any time.

3.6.1 Direct and indirect competitors

Table 3-2. Bygerm competition analysis (direct/indirect/potential competitors).

Type of competitionRepresent PlayerRelationship with Bygerm (overlapping points)Bygerm Difference / Response
Direct competition.POCT antigens/fast-checking;The same "rapid, field-based" respiratory pathogen test, partially overlapping with Bygerm(b) Antigen speed but low amount of information, multiple nucleic acids are directed more towards in-house inspection than out-of-house locations
Indirect competitors(c) Symptoms monitoring + empirical medicine;Meeting the core need to "judge what pathogen is and whether isolation/referral is required" in different ways is the current realistic alternative for the institution.Core entry points are time differentials: evacuation PCR 4-24 hours delay, symptoms monitoring no pathogen; Byegerm translates results into implementable decision-making on the ground within 25-30 minutes
Potential competitors(b) CRISPR, etc.;The main battlefield is not currently outside the compound, but has technology, brand name, channel or capital that can be accessed once sunk/cross bordersConstruction of non-pure technical barriers with "human-centered design + grass-roots scenario SOP + educational channels + sentinel data network"; Increased relocation costs with patent layout, compliance and pre-sentry relations

Conclusion: The real rival of Byegerm is not the "head IVD giant" but the "no-do-do-do-do-do" status quo in the out-of-house market, which means the agency can only observe + report + wait for the results." It is a blue sea that is seriously undervalued but completely open.

3.6.2 Five-dimensional matching of five listed business associates

The competition analysis answers "we and who robs the customer", and the bid analysis answers another question: Companies that have completed this path have been exposed to financial structures. We have selected the Dar'an gene, Dean's diagnosis, Marvian life, Sanctuary, Novo Zan's five listed companies to form the marker pool, which is based on their statement of equity, review of responses to queries and public disclosure of periodic reports. It is important to note that the pool is not a collection of "business-renowned companies" but a puzzle: each of the five companies provides a reference only to one dimension of Byegerm, and none of them is sufficient to be the object of the target alone.

Table 3-3. Five-dimensional pairing matrix (for the operational organization of Bygerm).

DimensionDan's gene.Dean's diagnosis.Mandarin.The sacred creature.Nouveau.
Securities Code002030.SZ300244.SZ300482.SZ688289.SH688105.SH
Listed board/yearIn-depth 2004Entrepreneurship Board 2011Businessboard 2015Science Board 2020Science board 2021
Core business patternsRaw materials + instruments + reagents vertically integratedICL Service + Product MixedPOCT Instrument + ReagentMolecular diagnostic instrument + reagent platformUpstream enzymes and bioreagents
Symmetric with BygermMedium (technical intergenerational reference)Medium (customer structure reference)High (product form co-conform)Medium-high (technology direction and component)Low (upstream, supplier)
Structural risks exposureDependence on upstream feedstock imports; Early reliance on technology-specific financingHigh level of accounts receivable; single supplier dependency; regional concentration(b) High marketing costs;Event-driven revenue;event-driven revenue; platform rather than terminal
Key parameter for BygermGovernment subsidies are not counted as income.DSO Assumptions 180–270 daysAnnual single card consumption is a core indicator;Single card price red line 46 yuanBOM Enzyme Cost Locked Price
Corresponds to a slow release actionDouble vendor certification + separate grantSeries A round is used mainly for advancesCard consumption as a first-level assessment indicatorIP Ownership Pre-A FateThree-year step price agreement signed

Four structural lessons were given to the marker pool, which were not a restatement of industry common sense, but directly rewritten the specific parameters in § 5.5 and § 5.6.

Lesson one: Māori rate structures determine business models, not vice versa. Māori splits between instruments and materials are a prerequisite for this model, not a business error, as demonstrated by the fact that the Māori ratio for PCT instruments usually falls below 30-45 per cent, with reagent consumption reaching more than 60 per cent. Any POCT project that tries to make money by selling equipment will fail - the higher the price of the equipment, the slower it is to be installed, the faster it is to determine the base of the reuse of materials. By doing so, Byegerm fixed the ratio of equipment to 40 per cent and established its orientation tool, with all profits to be borne by the materials and services.

Lesson Two: Accounts receivable are the real killers of the model of government and public institutions. The share of receivables in operating income diagnosed by Dean is consistently high. (a) Under DSO conditions of 180 days, an amount of approximately $0.49 per dollar of additional income is immediately taken into account; This effect is fully measured in § 5.6.4 and § 5.6.5 and its conclusion directly determines the scale and pace of § 5.4 financing.

Lesson three: Triple concentration is an essential element in reconciling audit and review. The concentration of suppliers (Dian diagnostics on a single upstream, Danian genetics on imported raw materials), regional concentrations (proximity of revenue within the province of Dian diagnostics) and product concentrations (single dependence on sacred species) exposes the same type of problems at three dimensions. For early projects, triple concentration is inevitable, and the question is not whether it exists, but whether there is a verifiable timetable for decentralization, which we place in § 4.4.2.

Lesson four: Event-driven income does not form the basis of valuation. St. Lucian and Nolan used "Cick" in their declarations. After the outbreak-related product's "literate disclosure of performance, this is in itself the answer given by the capital market: investors pay only for renewable income. Therefore, all three scenarios in § 5.6 are modelled on a regularized screening, without any increase in the outbreak; Epidemic peaks are treated in this model as top options rather than baseline assumptions.

3.7 SWOT Analysis

SWOT analysis helps us translate project strengths and weaknesses into concrete strategic actions. We deliberately paired every SWOT with a specific "strategic action" and added to the TOWS matrix so that SWOT was not static.

3.7.1 SWOT quadrant

Table 3-4. SWOT quadrant.

DimensionSpecific content (with quantitative indicators)Strategic Actions
Strengths Advantages
S1 Technological combination moat: RPA-CRISPR/Cas12a + microfluidic + AI interpretation + human-centered design integration of four elements has achieved 25-30 min results, 200 copies/mL test limits, CV < 5% industrial recovery, which is a rare combination in the country ' s grassroots POCT. S2 Client Validation Thickness: 1,300+Questionnaire + 30+ Expert Interviews, 89% Old People ' s Blindness Review, 94% Child Zero Fear, 95% Full-Screen Recognition - Quantitative evidence for every design decision. S3 Education Channel Assets: The EDU project has deposited 10+ generic packages covering 5 high-demand + 3 groups of people with special needs, constituting a low-cost access route to "first education, then marketing". S4 SOP Assets: Two sentinel (older homes + kindergartens) have embedded Bygerm into the morning screening process to form a replicable "institutional cooperation template". "Technology + scene + SOP + data + education" is used for external positioning; does not participate in single point puzzles.
Weaknesses
W1 Registration experience gap: Team does not have a precedent for type II/III ID registration, and the evaluation of the registration cycle is subject to uncertainty of six months. W2 Quantities are limited: currently small, manual batches of laboratories, single batch eligibility rates and BOM costs are not technically validated. W3 multi-centre clinical resources are insufficient: more than 3 GCP qualified hospitals have not yet been established. W4 Channels and Post-Sale System Gaps: No Sales Team, Training Certification System, Post-Sale SLA Standards. W5 Financial constraints: cumulative pre-commercial investment of approximately $45.5 million (2026-2029), customer settlement subject to the financial disbursement tempo (DSO 270.117180 days), cumulative cash shortfall in the baseline scenario peaked at $83.35 million, and operating cash flow only recovered in 2034. Completing through the Build-Partner-Buy (for details see § 5.2): Core technology self-study, clinical/manufacturing/channel partner, registration/legal affairs Buy; Financial side hedged four rounds of milestone financing against receivables factoring (§ 5.4, § 5.6.5).
Opportunites Opportunities
O1 Policy Window: The National Advancement of the District Medical Community, 2025-2027, a hard-line, old and old health management indicator, and the simultaneous release of the triple policy dividend for infectious disease quality control (influenza diagnosis and medication). O2 Market volume: China POCT approximately 23.1 billion yuan in 2025, Infectious diseases IDD about 20 billion yuan, internal respiratory pathogen detection around 10.1 billion yuan in 2028; O3 Population structure: 310 million, 60+ old age population, net annual increase of 1.309 million; silver-haired economy of 15.8 trillion; nursery market of $151.8 billion in 2024. O4 Technical dividend: CRISPR diagnostics and microfluidic nationalization has passed the technology cut-off; National production AI SOC marginal reasoning costs have dropped by 50 per cent. O5 Internationalized windows: South-East Asia, African grassroots PCT markets are willing to pay for low-cost multiple testing, and public benefit funds (Getz Foundation, Wellcome) are continuously procured. First, the three tracks of "old and small + sentinel" in the country were simultaneously demonstrated and 2030 + activated for international adaptation in low-resource areas.
Threats Threat
T1 Head IVD sinking: multiple respiratory tests have been set up in front companies such as Manfu, San Juan, and Daane, which pose a positive threat if they sink to the grass-roots scene. T2 Antigen Price Warfare: A single antigen detects a plant price of $5-8 with significant price anchor pressure; Byegerm is vulnerable to price war if he fails to say "information volume value". T3 Registration uncertainties: Category II/III IVD review cycle 1.5 - 3 years, with the possibility of delay of 12+ months if additional clinical treatment is required. T4 Fuzzy payment path: multiple testing at the grass-roots level of POCT has not yet entered the national health insurance catalogue and there is uncertainty as to whether out-of-pocket/project payments can be scaled. T5 Public trust and data compliance: Compliance events on health data for the elderly/children may trigger a systemic crisis of trust. T6 Alternative technologies: Temperature preservation of antigens, qPCR miniaturization, and next-generation platforms of synthetic biology are all subject to subversive advances within 3-5 years. Avoiding direct confrontation with PCR and low-cost antigens, focusing on "actionable on-site spot screening";

3.7.2 TOWS Matrix

The SWOT quadrant alone is not enough to guide action - what really has commercial value is the TOWS matrix: to combine internal (S/W) and external (O/T) factors, with four types of implementable strategies.

Table 3-5. TOWS Strategic portfolio matrix.

Opportunites (external opportunities)Threats (external threats)
Strengths (internal advantage)SO strategy (growth leverage):
Using S1 technology combination + S3 educational channels to capture the O1 policy window + O3 population structure, priority is given to three old age groups in the long triangle, Kyouta Zinyi + nursery-intensive areas with 20 "twins" demonstrating clients;
ST Strategy (Defence Reaction):
Validation of thickness with S1 + S2 client + S4 outpost SOP, hedge T1 head IVD sinking and T2 antigen price battles - competition with "actionable amount of information" (multi-pathogen + SOP + data) rather than "unit price"; building barriers with patents and data assets.
Weaknesses (internal disadvantage)WO Strategy (complementary borrowing):
With regard to the W1 registration experience and the M3 multi-centre clinical resources, the O1 policy window (the medical community pilot + the supervising sandbox) and O4 technical dividends were used to establish strategic partnerships with 1-2 M3+1 provincial CDCs to pilot clinical validation and save 30-50 per cent of the cost of independent clinical trials.
WT strategy (risk cessation):
For the W5 + T3 register uncertain + T4 payment path, use of milestone financing (see § 5.4 for details) and gambling clause to link each round of financing to the release of key risks that can be subject to external audit and to avoid "money spent and risk unsolved" valleys of death.

3.7.3 Strategic selection and prioritization

The TOWS matrix gives four types of candidate strategy, but "all four" means no strategy. In combination with the judgement of §2.5 PESTLE "Four-to-one" and the reality of § 4.4 in the risk matrix "Registered risks, financial risks two-high" we have clearly prioritized the four types of strategies and selected the main strategies.

Tables 3-6. Four categories of TOWS strategy priorities and options.

StrategyOur choice and reason.
Main strategy: SO (Grower)In the 18-36 months since the external policy window (O1) was not closed and the demographic dividend (O3) was on the rise, the combination of technology (S1) and educational channels (S3) were concentrated on capturing the Blue Sea, the out-of-hospital outpost, giving priority to the demonstration of clients at the local and long triangles of Jilin Province, Kyinzu, and the "two-posts" of Shinzuku. The Oportunidades window is time-limited, with pre-emptive whistle-point relations and SOP assets being the most difficult barrier to replicate by latecomers and SO being given first priority.
Parallel support: WOThe realization of SO depends on the completion of registration experience (W1) and multi-centre clinical resources (W3) in Phase I-II. Using the Community ' s pilot and supervisory communication, we have piloted clinical validation at the sentinel, working strategically with 1 to 2 Tri-Ace Hospitals + 1 provincial CDCs. WO is not an independent front, but an enabler for SO to clean up compliance and clinical barriers.
Defensive bottom line: ST (Defence Reaction)In the face of head IVD sinking (T1) and antigen price battles (T2), they insist on competing with "actionable amount of information" rather than unit prices, building barriers with patents and outposted data assets. ST is the bottom line of "no initiative but must be secured" and only starts when the head enterprise is clearly sinking.
Risk cessation: WT (Shrink self-insurance)In response to financial stress (W5) and registration/payment uncertainty (T3/T4), the use of milestone financing and a gambling clause linked each round of finance to the release of the risk that can be audited. WT is the "most undesirable trigger" scenario: if the key assumptions are false, then immediately shrink the front line, return to the stage, and avoid the "money spent and the risk unsolved" valley of death.

Summarizing the strategic choice of Byegerm, using SO as a spear, WO as a bridge, ST as a shield, WT as a base - using the combination of "technology + education + sentry SOP" in the policy window to capture the outdoor blue sea, and co-locate registration and clinical slabs with co-financing to maintain the defence and financial bottom lines with patents, data and milestones.

3.8 Protectability — IP and Open Strategy

Byegerm's intellectual property protection should revolve around "three hard and one soft" and be accompanied by an open source strategy consistent with the open spirit of iGEM.

Test system patents: RPA-CRISPR/Cas12a target group, response system optimization and multiple identification process.

Chip structural patents: microfluidic channels, pre-assembly reagents, sealed structures and self-destruct extinction modules.

Equipment structural patents: Heat control, optical testing, modularized slots and portable power.

Software and algorithmic assets: AI interpretation model, results classification algorithm, App interface and data processing logic.

From an IP asset valuation perspective, in the light of the valuation experience of the IVD Enterprise (Equivalent Technology Phase) over the same period, 3-5 core invention patents + 1-2 soft + 1-2 trademarks typically support the Angel Wheel valuation of $3,000 - $80 million. Bygerm plans to complete no less than three first-time applications for core patents in Phase I.

At the same time, as an iGEM project, the spirit of openness in science should prevail. (b) Basic SOP, science materials, non-sensitive app prototypes and training manuals are open sources; This strategy both protects Byegerm's living space as a business entity and allows the iGEM community to reclaim our human-centered design and educational resources.

There is also a pre-existing job that is easily ignored by the student team but which directly disrupts the transaction at all stages: confirmation of title. The inventions of student teams often involve the identification of job inventions, and rights holders may be school or mentor teachers rather than corporate subjects. We have established the recognition of ownership of job inventions, as well as the transfer or exclusive licensing of patents to companies, as matters that must be completed before the rotation of Pre-A, and have written into the Pre-A conditions of § 5.4, Table 5-4, Round Go/No-Go - which are the same as the risk of inquiry that is exposed to § 3.6.2 on the pool of "the undetermined right to cooperate in research and development".

After "do what" and "do what." And then we have to say "do what" -- this is Development Plans.

4. Development Plans, Milestones, Resources and Risks

4.1 Product Development Roadmap

We have divided the road map into three phases. At each stage, independent and measurable results are set, enabling donors and partners to judge progress at any point in time. Each stage also anchors "success KPI" and "reverse condition" and avoids scalding before, after.

Figure 4-1. Byegerm three-phase development road map Gantt (2026-2032, including the timing of key tasks and milestones financing).
Figure 4-2. Byegerm three-phase roadmap from validation to deployment.

Phase I — Validation|2026–2027

The core objective is to complete prototype validation and site exploration. Key tasks include:

Completion of RPA-CRISPR/Cas12a testing system optimization (five target cross-response < 0.5%, detection floor 200 copies/mL).

microfluidic detection card prototype completed.

Creates an AI interpretation app first edition (YOLOv8 framework, multiple scene light adaptation).

(c) Conducting testing of the availability of nursing homes, kindergartens and primary health-care settings, expanding the sample to at least 500 real users.

Collection of expert opinions and feedback from potential clients, resulting in a new version of the demand file.

Completion of initial intellectual property layout (not less than 3 core patents).

Development of standardized SOP and training materials for docking with the 10+ science general package that has already been validated in the EDU chapter.

Collection of baseline data for single annual card consumption: records the number of test card sheets actually consumed per year per pilot equipment. This is the most sensitive and the only input variable in the financial model (§ 5.6.1), which must be measured on-site rather than documented, and which increases the consumption of calories from 350 to 620, bringing the balance of gains and losses from 490 to 276 in-service machines.

Phase KPI: Laboratory validation data integrity + MVP prototype + not less than 2 sentinel institutions piloting + 1 core patent admission + single annual card consumption baseline data available. Refuse condition: Test lower limits or cross-reactions are not met

Phase II — Translation|2028–2029

The core objectives are engineering, small-volume production and preparation for registration. Key tasks include:

Optimizing the structure and equipment stability of the detection card and remodeling the shell in accordance with the plating process.

Establishment of small-volume production processes to connect 1-2 co-producers with IVD production qualifications.

Multi-centre validation with hospitals and CDCs (target not less than 3 clinical centres).

Preparation of NMPA Registered Testing, Clinical Evaluation and Quality System document, recasting R & D records as standard DHF.

Completion of supply chain dual-supplier strategy, establishment of domestic + international suppliers for key enzymes and chips, respectively, and dual-source certification of core enzymes.

Sign a three-year step price agreement for core enzymes. The assumption of single card BOM £30 is premised on the core enzyme lock price; if the lock price fails, the full cost structure of § 5.5.2 needs to be re-run.

More sentinel institutions were piloted to cover transclimate, rural and urban areas.

Establishment of a marketing, training and after-sale system.

Stage KPI: Small batch BOM cost £30/calculation + Good rate + 95% + Registered Test accepted + 1-2 MAC data from MAC hospitals + Core enzyme double-source certification and step price agreement set. Refusal condition: BOM or a bad rate of underachievement Delay registration and surrender and concentrate process optimization.

Phase III — Deployment|2030+

The core objectives are regional expansion and ecological construction. Key tasks include:

Deployment of a network of outposts in more municipal areas, targeting 50+ sentinel institutions, using the generic calibration "in-service" rather than "cumulative delivery".

Extension of pathogen panel (e.g. addition of SARS class, new outbreak agent reserve Panel).

Establishment of public health data Dashboard, interfaced with the CDC/WHC system and made data services a stand-alone, renewable fee contract rather than a hardware grant.

Explore payment paths with health insurance, insurance, public benefit funds or government projects.

International cooperation and adaptation of low-resource areas (e.g., South-East Asia, African grass-roots POCT pilots).

Establishment of long-term ESG and medical waste management mechanisms.

Phase KPI: Regional Repurchase Rate 50% + Crossing the Gains and Loss Balance Line (276-490) with an installed machine + Net Cash Flow from Operating Activities (base scenario 2034) + Landing of at least 1 local-city CDC data interface + International Pilot 1-2 + Data Services Revenues 25%. The last one is not just an increase path: it's a valuation logic of "IVD materials manufacturing" to switch to "public health data infrastructure", meaning § 5.7.3.

4.2 Regulatory and Clinical Path

Bygerm is an in vitro diagnostic-related product and commercialization cannot bypass registration, clinical evidence, quality systems and data compliance. In accordance with the NMPA regulations for the registration of in vitro diagnostic reagents, the in vitro diagnostic reagents for category I are subject to record management and the in vitro diagnostic reagents for categories II and III are subject to registration management. Based on the properties of the multi-detection of the five pathogens, the Byegerm reagents are presumably in category II or part III; Hardware equipment is also required to be declared in accordance with the medical equipment classification rules.

From industry experience, class II exemption clinical pilot projects typically have a registration cycle of 1 to 1.5 years and class III contains clinical pilot project cycles of 2 to 3 years; the total cost of registration tests, clinical trials, system verification usually falls between 3 and 8 million yuan. This is the core source of § 3.7 Threats T3 and the hard-bargaining of § 5.4 sub-cycle financing.

Therefore, we are considering seven compliance actions simultaneously in the early stages of development:

Product Classification and Registration Path: At the prototype stage, the category is locked against the NMPA In vitro Diagnostic Reagent Classification Subdirectorate.

Registration requirements: Contact a national or provincial medical equipment testing facility at the end of Phase I.

Clinical evaluation or clinical trial design: combine multi-centre samples with real world data.

Real world data collection: Accumulation through sentinel compliance uplink mechanisms.

Quality management system: constructed in conjunction with the Standard for Quality Management of Production of Medical Devices by YY/T 0287-2017 (equivalent to ISO 13485). [S13]

Data security and privacy protection: compliance with the Personal Information Protection Act, the Data Security Act, and the Information Security Technologies Guide to Health Medical Data Security (GB/T 39725). [S14] [S15] [S16]

The medical institutions explain the boundary: in SOP, the treatment norms of "preliminary screening is subject to in situ review" are defined and the liability boundary is defined.

The proactive presentation of the compliance path suggests that Bygerm does not stop at proof of concept, but understands the true path of commercialization of medical products.

4.3 Required Resources

Bygerm push requires not only funding, but also technical, clinical, manufacturing, compliance and market resources.

Table 4-1. Byegerm resource requirements, category VI.

Resource typeSpecific needs
Technical resourcesMolecular detection system optimization, crRNA and quote design, microfluidic chip processing, optical detection, temperature control hardware, AI App
Clinical resourcesHospital departments for infection, respiratory, testing, clinical samples and multi-centre certification (target 3 GCP qualification institutions)
Public health resourcesExpert guidance on CDC, sentinel scenes, regional trend analysis mechanism
Manufacturing resourcesChip processors, equipment assembly plants, key feedstock suppliers, quality control systems (two suppliers)
Commercial resourcesChannel partners, institutional clients, training teams, after-sale systems
Compliance resourcesRegulations consultant, ethics review, data security, preparation of registration documents

4.4 Risk Matrix and Mitigation

We systematize the main risks by technology, registration, market, supply chain, finance, data ethics, environment by seven dimensions, and provide specific implementable mitigation actions for each type of risk. Each category of risk has a "probability x impact" rating that allows for location in the risk thermal matrix.

4.4.1 Seven types of risk and mitigation actions

Figure 4-3. Risk heat map showing probability and impact across seven risk categories.

Table 4-2. Risk heat matrix (P = probability of occurrence, I = degree of impact).

Type of riskLevel (PXI)Possible performanceResponse
Technical risksMedium x highMultiple detection cross-response, complex sample interference, AI errorMulti-centre validation, quality control, algorithm threshold calibration, manual review mechanism
Registered riskHigh x HighIVD Registration cycle 1.5 - 3 years, insufficient clinical evidenceEarly design of registration paths, establishment of clinical validation cooperation with hospitals, pre-trial communication;
Market riskCentreGrass-roots clients don't trust new technologies, they don't know how to pay.Spectrum demonstration, expert endorsement, trial kits and training SOP, first free and then paid trial - transformation model
Supply chain riskCentreUnstable supply of critical enzymes (RPA, Casa12a), chip materials or optical modulesDouble-supplier strategy, national production substitution, safe inventory (6 months); three-year ladder price agreement lock price for core enzymes (Phaase II KPI)
Financial riskHigh x HighPre-commercial inputs 45.5 million yuan; DSO 180-270 Angel "Growth or Blood Loss" with a cumulative cash gap peak of 83.35 million yuan for the baseline scenarioFour rounds of milestone financing on a scale that is "not negative" at any point in time of cash balance, rather than on an expansional demand (§ 5.4); Pre-A phase pre-signing receivables factoring framework, crushing DSO to 90 days; trigger line "in use of 276-490 ", which triggers contractions if not met
Data ethics risksLow x HighPrivacy disclosure, misreading of results, overreportingLocal encryption, desensitization upload, authorization mechanisms, doctor ' s interpretation of boundaries, ethics committee review
Environmental riskCentreOne-time materials put waste pressureLight Quantified Materials, In-Situ Decontamination, Medical Waste SOP, Third Party Disposal Agreement

The risk thermal matrix shows that the registered risk and the financial risk are both high and high and must be pre-empted. This is consistent with § 3.7 W1, W5 and T3, T4 in SWOT.

4.4.2 Triple concentration and verifiable decentralization schedule

§ 3.6.2 Lesson 3 points out that supplier concentration, customer concentration, regional concentration and product concentration are four sides of the same category of issues, and are also mandatory for the due diligence and registration review. For the early projects, concentration is the inevitable -- it's not about whether it's concentrated, it's about when and in what verifiable way. We wrote this schedule in advance and tied it to the Roadmap phase.

Tables 4-3. Status, questioning and decentralization schedule of triple concentration.

Concentration dimensionEarly necessityWhat'll you ask?Verifiable decentralization schedule
Vendor concentrationSingle microfluidic Substitute; Core Enzyme Single SourceAlternatives and switching cycles in case of supply interruptions?Completion of a second small batch validation of surrogate; core enzymes by Pre-Series A round Dual Source Authentication
Client concentrationThe first posts were focused on two pilot agencies.The top five clients' share of income?Phase III Combined top five clients down to 50%
Regional concentrationFirst steps in Jilin provinceHas cross-regional replication capacity been validated?Phase III First year, two out-of-provincial municipal landings were achieved and the share of provincial income fell to less than 70 per cent
Product concentrationSingle 4+1 Respirator PanelThe risk of single product failure or substitution?Phase III Start panel extension, second panel income ratio target 15%

4.5 Why the Plan Is Realistic

Bygerm's plan is not "one step at a national level" but a phased, low-risk, evidence-driven path:

Validation of technology first, then validation of users; Access to sentry scenes, then replication of regional cases; Establishment of high pain point demonstration clients, then extension of channels and product lines. The need for funding at each stage is linked to the key assumptions that need to be answered at that stage - if the assumptions at one stage are not validated, we will stop expanding and revert to the previous phase. This "assumption-validation-upgrading" cycle is consistent with the commercialization of medical products and with the entrepreneurship encouraged by iGEM to move from proof-of-concept to real-world solutions.

5. Required Capabilities, Funds and Stakeholders

Questions answered in this section: Byegerm is not a work of students with only beautiful technical concepts, but has identified the capabilities needed to continue to develop (Capabilites), funds (Funds) and Stakeholder (Stakeholders) networks and has been able to gradually transform the iGEM prototype into a verifiable, registerable, deployable and sustainable on-site detection system. Our judgment is that Bygerm must adopt the eco-economies model of "Student Team Leading Early Validation + Specialists and Industry Partners complement critical competencies + sentinel clients verify values". This chapter is based on the "Capacity List - Team Strengths and Disadvantages - Stakeholder - Finance Motion - Business Model - Financial Projections - Return and Exit of Investment" and is based on the "Five Circle Four" model of § 5.3 as the hub, which allocates each of the tasks in chapter 4, Roadmap, each of the capabilities in § 5.1, each round of financing in § 5.4 and each of the revenues in § 5.5 to specific bearers. Of these, § 5.6 to § 5.8 is the financial base of this chapter: all projected values are derived from the parameter summary table of § 5.6.1, which can be fully recalculated by any reader, and we do not provide conclusions that cannot be reproduced.

5.1 Capability Map

Continuing to advance Bygerm requires seven core competencies. Each type of capability corresponds to the specific key tasks in Phase I-III, and also finds the principals in the § 5.3 "Five Rings Four" to avoid delinking the "capability list" from the "real division of labour".

Table 5-1. Seven categories of core competencies required for the commercialization of Bygerm.

CapabilityWhat it deliversPhase mappingPrimary owner in Five Rings
Synthetic biology and molecular diagnosisContinuous optimization of RPA-CRISPR/Cas12a response system, crRNA/quote design, target combination extensionPhase I full course;Phase II multipathogen panel extensionTeam Build
microfluidic and hardware engineeringClosed detection cards, temperature control modules, optical detection structures, portable equipment engineeringprototype I;case II engineering and small batchesTeam Build + Ring 4 Partners
AI and softwareImage Identification, Results Interpretation Model, App Interface, Institution Dashboard and Data APIinitial I;case II-III continuous iterativeTeam Build
Clinical transformationSample validation, clinical evaluation programme, multi-centre hospital validation, results explaining boundariesPhase II focus;Phase III continuous extensionRing 3 Partners (hospital/testing/CDC)
Legislation and quality managementII/III IVD registration path, ISO 13485 quality system, risk management, post-market supervisionPhase I pre-frame; Case II landing; Case III maintenanceRing 5 Partners/Buy (Registered Consultant + Legal)
Commercial developmentCustomer detection, channel building, pricing strategy, training and after-sales system, cooperative negotiationsPhase II starting;case III regional expansionTeam Build + Ring 4 Partners
Public health integrationConnect single-point detection to whistle alerts, regional trend analysis and institutional management processesPhase II pilots;case III regional infrastructureRing 3 + Ring 5 Partners (CD + Policy)

The key to the above table is not to list capacity, but to show that each capacity is not presented in a suspense - either for a Roadmap phase or for a category of stakeholders or both. This makes Chapter 5 a "division map" of the first four chapters, not a new argument.

5.2 Team Strengths and Gaps

The greatest advantage of the Byegerm team is not a single-scientific capability, but the ability to connect the three lines of "synthetic biology technology - real scenario demand - commercial path". We have an interdisciplinary basis for synthetic biology, molecular testing, hardware design, software development, IHP research and business analysis that can link laboratory innovation to real scene needs. This integration capability has been demonstrated in three facts that can be validated externally:

Technical integration: Independent completion of the RPA-CRISPR route selection, multi-target reference design, AI interpretation model training and microfluidic chip modelling to form a demonstrationable end-to-end MVP.

Network of experts: Establish a "research-compliance-policy" feedback channel with testing, clinical, compliance and policy specialists from Zhejiang University, Jilin University, Alberta, etc.

Site coverage: In six categories of retirement homes, kindergartens, communities, hospitals, industry, and supervision, clients who have completed a user-industry system found that over 1,300 questionnaires were recycled and 30+ experts interviewed.

At the same time, we are conscious of the fact that health products need to move from the iGEM prototype to the real world, across the five thresholds of "scientific viability -- engineering stability -- clinical credibility -- regulatory compliance -- commercial sustainability." The student team cannot complete all five thresholds on its own, so the key is not "presumably full-fledged" but rather visible identification of gaps, visible allocation of resources, visible design of recent actions. The main current gaps and ways to fill them are as follows:

Table 5-2. Team capacity gaps and risk management resources.

GapRisk if ignoredPartner / resource neededNear-term action
Insufficient registration experienceUncertainty of product path, high cost of post-compensation material, delay in listing 12+ monthsIVD Registered consultant, legal expert, quality system consultantMVP phase: development of design input, intended use, risk management and clinical evaluation framework
Inadequate resources for multi-centre clinical validationTesting performance is limited to laboratories, and access to hospitals, CDC and investor trust is difficult3A hospital inspection/respiratory, primary fever clinic, CDCsLet's do a validation of the availability and consistency of small samples, and then expand to a multi-centre real sample.
Inadequate engineering and production capacityCassette leaks, temperature instability, batch differences and cost out of control.Medical equipment ODM, microfluidic chip manufacturer, mass engineering DivisionConduct a DFM evaluation to establish standards for small batch test production and material quality control
Inadequate market access and after-sales systemPilots can be done, they can't be done, they can't be used, they can't be used, they can't be bought.Regional medical service providers, institutional training partners, after-sale services BusinessDevelopment of standardized training packages, post-sales response processes and whistle-blower success indicators
Inadequate data security and ethical governanceData related to the elderly, children and health, which may give rise to privacy, miscalculation and liability disputesData compliance lawyer, ethics committee, information security engineerDesign desensitization, delegation of authority, hierarchy, interpretation of results and mechanism for disposal of anomalies
Inadequate long-term financing and corporate governanceResearch and development gaps, critical brain drain, lack of confidence among partnersEntrepreneurs, government projects, seed investors, strategic partnersReplacement of one-time large-value financing with milestone financing and release of equity on the basis of risk release

Thus, the organizational strategy of Byegerm is not "student team covers all the links", but rather uses the Build-Partner-Buy combination path: core algorithms, product definition and early validation by team Build; Clinical, regulatory, manufacturing and channel through partner; Legal, registration, quality systems and partial engineering tests are complemented by Buy's professional services.

5.3 Key Stakeholders — Five Rings and Four Flows

For Bygerm, stakeholders should not simply be understood as "all those who have heard of the project". We define stakeholders as individuals, institutions or organizations that can influence the success of the project or be affected by the use of products, data flows, resource allocation, risk-taking, at any stage of Bygerm from conceptual validation, MVP, clinical validation, registration, pilot deployment to scale operations.

To avoid being too broad or too narrow, we set three inclusion thresholds:

(c) Decision demand: Have decision-making power to purchase, access, clinical acceptance, regulatory approval, payment or promotion.

Value-use present: direct use of products, interpretation of results, action based on results, or health and management value from results.

Risk-afflicted risk of error, privacy, ethics, biosafety, costs, waste or public opinion.

Only subjects that meet at least one threshold and can provide demand, evidence, resources or constraints in product development are included in the Byegerm key stakeholder model.

5.3.1 Five Rings Model

We have integrated stakeholders into the Five Rings and Four Flows model. Five-ring represents the distance of different subjects from the core of product values - from the person served to the person deciding whether or not they can be served; The four-stream represents the key exchange that occurs between them - demand, evidence, product-service, governance-capital.

Figure 5-1. Byegerm Five Rings stakeholder model and the four flows between them.

Table 5-3. Byegerm Five Rings Stakeholders Model.

RingStakeholdersCore interestRole in commercializationKey evidence
Ring 1 Served and Data SubjectOlder persons, children, persons with respiratory symptoms, vulnerable groups, persons in close contact, family membersSamples are friendly, results are reliable, privacy is safe, anxiety is reduced and medical treatment is unnecessaryDefine real demand and acceptability as the ultimate criterion for whether the product "is worth using"Use of will, sample points, understanding of results, privacy concerns, willingness to pay, family communication feedback
Ring 2 scene client with first-line operator(b) Caregivers, teachers, medical doctorsQuick diversion, reduced concentration risk, reduced disruption of operations, clear lines of responsibilityThe first ones, the MVP's SOP, training, deployment and repurchase.Pilot records, SOP implementability, duration of training, error rate, disposal process, intention to repurchase
Ring 3 Evidence BuilderRespiratory, infectious, paediatric, geriatric, examining physicians; Public health and epidemiology specialists, statistical specialistsTesting performance, clinical significance, data quality, interpretation of results and public health valueProvide an expert feasibility test to get Byegerm from the concept to a credible product.Expert interviews, clinical evaluation programmes, recommendations on control methods, recommendations on target combinations, validation of data
Ring 4 Deliverermicrofluidic chip providers, enzymes and reagent providers, medical devices ODM, software and cloud service partners, distributors, after-sale training partners, medical waste disposal partnersStable supply, cost control, consistent quality, channel efficiency and service capacityDetermining whether products can be produced, delivered, trained, maintained and re-purchased on a continuous basisBOM, quotations, capacity, quality control standards, channel coverage, SLA, waste
Ring 5 Accessors, payers and legitimacy providers(b) iGEM Community, scientific institutions, open-source partnersSecurity compliance, social benefits, cost-effectiveness, risk control, long-term sustainability and public trustDeciding on the boundaries of access, payments, financing and scale, and influencing the legitimacy of social acceptance and responsible innovationRegistration path counselling, payment criteria, cost-effectiveness analysis, terms of procurement, terms of investment, science and open source agreements

5.3.2 Four Flows

Need flow (demand flow): Import product definition from Ring 1-Ring 2.

Evidence flow (evidence stream): Remittance of product credibility from Ring 3.

Product-service flow: Output from Ring 4 to first-line scene.

Global Flow (Governance-Capital Flow) from Ring 5 project scale borders.

5.4 Funding Plan

Bygerm's scale of financing is not determined by "how much it takes to expand", but by "cash balances must not be negative at any point in time and a reasonable safety cushion should be maintained". The immediate consequence of this calibre is that the pace of financing is determined by § 5.6 cash flow forecasts, not by market ambitions. The use of each round corresponds to the key assumptions of chapter 4 Roadmap and corresponds to the key flows in the different rings in § 5.3, creating a milestone rhythm matching the "fund-risk-evidence".

Table 5-4. Four-round milestone financing arrangements (total $145 million).

RoundTimeSize (thousands of dollars)Main usesGo / No-Go condition
Seed round
2026 Q2 700 Prototype optimization, five-target system validation, IP layout, double-post pilot, consultant network development Test floors, cross-responses, expert feasibility, any of which do not meet the prescribed threshold, and stop expansion.
Seed + Wheel
2027 Q3 800 microfluidic Card Prototype, AI Interpretation App, 500 real user availability test, annual calorie consumption baseline collection MVP failed to complete the end-to-end presentation on a real scene without entering Pre-A
Pre-Series A round
2028 Q1 3,000 Small batch engineering, multicentre validation, registration testing and system documentation, core enzyme lock price agreements, supply chain dual source (a) The registration path was not pre-cleared or the yield rate/single card BOM did not meet expectations;
Round A
2029 Q2 10,000 Operating funds advanced primarily (covering government and public institution accounts period), followed by registration advancement, regional expansion and data platform development Registered evidence, regional buy-back rate, number of contracts for payment for data services listed as a bet; required to obtain factoring or not less than 30 million yuan current loan

5.4.1 Why four rounds and A?

Our original vision was three rounds: Seed Wheels 3-50 million, Pre-A Wheels 20-30 million, Series A 8,000-15 million. After the year-by-year input was placed in the cash balance sheet, two points had to be amended.

The first is rhythm. 2026-2029 for the Phase I-II input period, without commercialized income, with an annual investment of 380, 620, 1,450, 21 million yuan, totalling 45.5 million yuan. Of these, 2026-2027 totals about $10 million in two years, and three-and-five million seed wheels will form the funding cut-off point by the end of 2027. So we're going up to $7 million on the Seed round, and we're going to fill up the 8 million seed + wheel in 2027 -- which is not an easy bridge, without which the project will break at the end of the year.

The second is qualitative. (a) The size of the wheel should be pushed back by the accumulated cash gap (base scenario $83.35 million) and not by expansionary demand; This is one of the most intuitive parts of this chapter and the easiest to mislead investors -- we would rather write it in the eye of the body than want the investors to figure it out when they do it.

5.4.2 Validation of year-by-year cash balances

The following table is the only hard test of whether a financing plan has been established: any year-end cash balance is negative, and the arrangement does not exist.

Tables 5-5. Year-by-year reconciliation of financing to accounts and cash balances (base scenario).

YearFinancing to accounts (millions of dollars)Cash flows for the year (millions of dollars)Cash balance at year ' s end (millions of dollars)Annotations
2026700-380320The lowest point in the cycle, the thinest cushion.
2027800-620500Seed + wheel is necessary and the absence of this wheel will break at the end of the year
20283,000-1,4502,050Entering engineering and registration commitment period
202910,000-2,1009,950A Round-the-clock, to provide water for the period
2030—-4669,484First year of commercialization
2031—-6838,801Installation speeds up and operating funds increase
2032—-1,1287,672Cash consumption peak range
2033—-1,2996,373Cash consumption peak range
2034—-2086,165Operating cash flows are on the right track. Free cash flows are close to balance.

The replacement of one-time large-value financing with "cut-off financing + gambling clause" is the core financial discipline of Bygerm to address the W5 financial burden and T3/T4 uncertainty in § 3.7 SWOT; the inverse scale of "no negative cash balances" gives the discipline the form of a value to be audited externally.

5.5 Business Model

The Byegerm business model can be summed up as: equipment entering the scene, waste materials repurchase, App and data services. It's a typical combination of "hardware penetration -- fuel repurchase -- service subscription."

5.5.1 Revenue Streams

Table 5-6. Bygerm Six income streams and corresponding Maori structures.

Income typeTypical client.Māori rate (inter-industry/ model extraction)Conjunctive rings/ streams
Sale/lease of portable equipmentHospitals, kindergartens, primary care35% - 45% / 40%Ring 2 / Product-service flow
Checkcard + Repurchase of sampling materialsAll corporate clients55% - 70% / Take 70%Ring 2–Ring 4 / Product-service flow
App Advanced Functional SubscriptionInstitutional Manager≥70% / Integrating data and services, 87%Ring 2 / Need + Product-service flow
Training and protection servicesInstitution + Channel40%–55%Ring 2 + Ring 4
Dissensitization trend reporting and public health data servicesCity-level CDC, health committees, scientific institutions75% / integrated with data and services, 87%Ring 5 / Governance-capital flow
Government/public benefit system cooperationCDC, Public Benefit Fund, Enterprise ESG ProjectProject system 30% - 50%Ring 5 / Governance-capital flow

Six income streams were condensed in the financial model into three business actions that could be actively intervened by the team, rather than an "annual growth rate". The core constant equation is:

Annual consumption material income = cost of a single card per unit per year

Annual equipment income = new installed units x unit cost of equipment for the year

Data and service income = (Equipment + Materials) x Service adhesion rate

Of these, the cumulative arithmetical averages of the "number of machines in use (annual average)" installed at the beginning and end of the period. The value of this modelling is that each variable corresponds to a specific action - the number of platform channels and the pilot drive, the annual calorie scenario SOP design and product accessibility, the single-card price matching pricing and collective negotiation; and the "income growth rate" does not correspond to any action, cannot be executed by teams or validated by investors. This is also why we have listed "single annual card consumption" as a level I indicator (§ 4.1).

5.5.2 Costa Structure and Pricing Logic

Pre-commercial inputs: hardware research and development, moulds, App development, registration declaration and quality system construction, for a total of approximately $45.5 million in 2026-2029 (§ 5.4).

Change cost: enzymes, crRNAs, probes, chips, samplers, packaging and logistics (target card BOM ≤30, subject to core enzyme lock price).

Compliance costs: Registered testing, clinical certification, third-party testing, ethical review (approximately $30-8 million, already included in pre-commercial inputs).

Market costs: Piloting, training, meetings, channel incentives and after-sales response, as reflected in § 5.6.3 for sales costs.

Table 5-7. Operating cost structure (compacting § 5.6.1 for parameter summary).

Cost itemProportion of corresponding incomeMāori rateComposition and strategic anchorage
Hardware equipment cost60%40%CMOS Sensor, Precision Heating Module, microfluidic Main Panel, Shell Simulation, BOM Costs and Outsourcing Costs. Bottom price permeable, not centre of profit.
Reagent consumption cost30% (single card $30 / $100)70%Cas12a protein enzyme, RPA amplifier, microfluidic card box plastics, degradable packaging and logistics. The price of the core enzyme is critical.
Data and service costs13%87%Cloud server lease, API maintenance, computing and data encryption desensitization compliance costs

Pricing Logic: Lowering the threshold for entry of equipment to eldercare facilities, kindergartens and grass-roots institutions (free laying or leasing of equipment in the first year), establishing a stable cash flow (0.5 screenings per person per year x approximately $100 per single card) through repurchase of materials, providing data services, maintenance services and advanced reporting functions to clients of CDC and hospitals. Equipment is a diversionary tool, and waste materials and services are the source of profit - a division of labour that is not business-related, but rather a structural conclusion given by lessons learned.

The price reduction is a certain event rather than a risk event, as demonstrated by the price trajectory of the sacred species. So we have to figure out how much to lower the single-card terminal price with BOM fixed at 30. The following table is based on § 5.6 baseline scenario Data for 2034 (all 3,150 units per year are installed x 620 = 1953,000).

Table 5-8. Single-card terminal price sensitivity and price red line (BOM fixed to $30).

Unit terminal price ($)Income from materials consumed (millions of dollars)Māori (millions of dollars)Māori rate of materials consumedStatus determination
100 (current pricing)19,53013,67170.0%Baseline scenario extraction value
8015,6249,76562.5%Affordable, still above 60% of target lines
7514,6488,78960.0%Set aside the position of the target Maori rate after the buffer for collection
6011,7185,85950.0%Affordable, subject to simultaneous compression of combined cost rates
468,9833,14435.0%Red line of prices: collapse of business model
458,7882,93033.3%Breaked Red Line

This table translates the characterization of "setting down price buffers for provincial IVD collections" into specific negotiable figures: From the current pricing of $100 to the 60% Māori rate target of $75, Byegerm owns 25% of the price reduction; from $75 to $46, the red line has 39% of the space, provided that the combined cost rate is simultaneously reduced to less than 30%. The dollar should be the starting point for cost justification in negotiations with the central authority - it is not an offer but an industry cost boundary based on BOM structure.

5.5.3 Unit Economics

Based on the five-year life cycle of a single device, annual customer loss rate of 15 per cent, steady annual calorie consumption of 560, the lifetime value of a single device (LTV) was 16.58 million yuan, of which 0.6 million yuan was contributed by equipment, 14.54 million yuan by materials consumed, and 1.45 million yuan by data services - 88 per cent by materials consumed. This ratio in itself suggests that the number of equipment sales is hardly independent in this model.

Table 5-9. Economic measures in units (LTV / CAC).

Cost of single-stage customers CAC (millions of dollars)LTV / CACCompliance (Target 3)CAC recovery cycle
2.0 (channel maturity)8.3Achieved0.51 years
3.5 (baseline assumptions)4.7Achieved0.89 years
5.0 (early direct sales)3.3Achieved1.28 years

The LTV/CAC under the 3rd tranche CAC meets the thorium 3, and the recovery cycle is up to 1.3 years. But there is a fragile premise to this conclusion: an annual client loss rate of 15 per cent. If the institution fails to develop a usage habit after trial and the loss rate rises to 30%, the LTV will drop to approximately $1.19 million; Under CAC's early direct sale of $50.0 million, the LTV/CAC will fall to 2.4 and break the target line. So, "an institutional customer's 24-month retention rate of 60%" is not a good operational indicator, but a prerequisite for a unit economy to be established -- we add it to the "LTV/CAC 3" annual repurchase rate of 50% of the fuel-consumption ratio of 50%."

5.6 Financial Projections

5.6.1 Summary of modelling methods and parameters

All projections in this section are extrapolated from the following table, by which any reader can reproduce in full each of the values § 5.6 to § 5.7. The differences between the three scenarios are based only on installed rhythms and caloric consumption, with prices fixed at $100 in the three scenarios - this is intentional: prices are determined by the aggregate policy and are outside the control of the team, so uncertainty is placed on two variables that the team can influence, and the effects of price changes are borne separately by table 5-8. A description of the calibre is also required: all three scenarios are modelled on a regularized screening process, excluding any increase in the outbreak, the peak of which is treated as an upper option in this model.

Table 5-10. Summary of input parameters for the three scenarios (all projected inputs for this section).

ParametersConservative scenarioBaseline scenarioOptimistic scenarioValue taken from
Accumulators (2030~2034, stations)90→2,600120→4,000180→7,000Bottom-up: sentinel agencies permeating the rhythm, alignment Roadmap Phase III "50+ sentinel"
Single annual card consumption (one sheet)300→520350→620400→720Phase I Level I indicators to be collected for usability tests
Unit terminal price ($)100100100Value is positioned 80-120 yuan, to take the median value (§1.2.3).
Single Card BOM (dollars)303030Phase II KPI cap; premised on core enzyme lock price
Unit cost of equipment (thousands)1.501.501.50Low Maori penetration pricing, not as a centre of profits
Māori rate of equipment40%40%40%Medium range of Māori rates for the terracian organisms POCT instrument
Māori rate of materials consumed70%70%70%By single card 100/ BOM 30
Data and Service Māori Rate87%87%87%Costs are mainly cloud resources and compliance, with significant scale effects
Service attachment rate5%8%12%Data service income as a proportion of hardware + materials
R & D cost rate25%→17%Same LeftSame LeftFive-year linear contraction; endpoint reference plate processing median level of enterprise R & D inputs
Sales cost rate18%→13.5%Same LeftSame LeftTake the step up between sectors for the reasons given in § 5.6.3
Management cost rate12%→7%Same LeftSame LeftEarly burden quality system, registration maintenance and equity incentive amortization
Financial cost rate2%→1.8%Same LeftSame LeftInterest on receivables factoring and bank lending
DSO (days)270→180Same LeftSame LeftDean ' s diagnostic lessons; taking up steps and down steps
Inventory/account payable turnaround (days)60 / 75Same LeftSame LeftIVD Conventional level of materials manufacturing
Income tax rate15%15%15%Preferential tax rates for high-technology enterprises; retreat to 25 per cent without qualification
Capital expenditureIncome 6 + first year 1.5 million yuanSame LeftSame LeftModels, wires, detection equipment
Depreciation amortizationIncome 2%Same LeftSame LeftApproximation under the light asset model
Exit PS Multiple3.5×5.0×6.5×Domestic IVD into long-term asset mergers and acquisitions slots, with increments
Pre-commercial inputs (thousands)2026: 380 / 2027: 620 / 2028: 1,450 / 2029: 2,100, total 4,550Same LeftSame LeftIncluding registration compliance costs: $3 million-8 million

5.6.2 Expected income

Revenue from commercialization has been recorded since 2030 (Phase III initial year). 2026-2029 is the input period for Phase I-II, with no commercialized income, and its cash impact is shown in tables 5-5.

Table 5-11. Income projections and structural evolution of the baseline scenario.

YearCumulative loader (station)Yearly consumption (Zhang/Tai)Equipment revenue (thousands)Income from materials consumed (millions of dollars)Service income (thousands)Business income (thousands)Percentage of materials consumed
20301203501802103142149.9%
20314204204501,1341271,71166.3%
20321,1005001,0203,8003865,20673.0%
20332,3005601,8009,52090612,22677.9%
20344,0006202,55019,5301,76623,84681.9%

The evolutionary path of the income structure itself is an indicator of the health of the business model: the share of consumption income rose from about 50 per cent in 2030 to 82 per cent in 2034, indicating that the installation has actually entered the daily work stream of the institution, rather than being left idle in the warehouse. If the consumption ratio does not work for a long time, even if the number of installed stations is pretty, it means that the product is not actually being used -- this is the first warning indicator for internal controls.

Table 5-12. Three scenarios, income versus profit.

Indicator (2034)Conservative scenarioBaseline scenarioOptimistic scenario
Cumulative loader (station)2,6004,0007,000
Single annual card consumption (one sheet)520620720
Business income (thousands)12,92623,84649,157
Māori rate67.0%68.1%69.0%
Net profit (thousands)3,0415,82812,403
Net interest rate23.5%24.4%25.2%
2030-2034 Average annual compound rate of income growth159.8%174.3%188.9%

5.6.3 Cost paths for the period

In the IPO audit logic, "the risk of commercial bribery due to excessive sales costs" and "the lack of research and development inputs" are areas of serious concern. Cost structure projections require precision circumvention of these two mined areas, while avoiding underestimation of real costs for good reporting purposes.

Table 5-13. Five-year course of cost rates for the period.

Cost items20302031203220332034Structure description
R & D cost rate25.0%22.0%20.0%18.0%17.0%Dry and wet experiment error, crRNA design, YOLOv8 model optimization and registered clinical outsourcing (CRO); significantly higher than about 10% of traditional IVD manufacturing enterprises
Sales cost rate18.0%16.5%15.0%14.0%13.5%Channel laying, training, after-sales response and academic outreach; below 20-30% of traditional IVD enterprises
Management cost rate12.0%10.0%8.0%7.5%7.0%Senior managers and administrative remuneration, space, equity incentive amortization, ESG compliance and audit costs;
Financial cost rate2.0%2.5%2.0%2.0%1.8%Interest on receivables factoring and bank lending; as a result of increased use of funds during small uploading periods in 2031
Total57.0%51.0%45.0%41.5%39.3%Combined cost rates distributed with size

An explanation is required for the start of the 18 per cent sales fee rate. It is true that open-source networks and public-interest sunk models can reduce traditional KOL maintenance costs, but here there are two types of costs: open-source networks reduce "market education costs" - to make institutional managers understand why multipathogen screening is needed on site. (b) It cannot reduce "channel maintenance costs and post-sale response costs" - equipment failure response, distribution of consumables, operational training refresher, quality complaints processing, which must be borne by its own team or channel partner. So we take up to 18 percent of the industry, and then we grow to 13.5 percent each year after the channel matures and repurchases. Such cost projections are closer to real operations and more affordable to pursue.

5.6.4 Three forecast statements

The three tables are cross-checked and the balance sheet has been balanced (the difference between "total assets" and "total liabilities and entitlements" for each year is zero).

Table 5-14. Projections of the base scenario profit statement.

Projects (thousands)20302031203220332034
Business income421.21,710.75,205.612,225.623,846.4
Operating costs175.1626.71,802.14,053.77,618.6
Mori.246.11,084.03,403.58,171.916,227.8
Māori rate58.4%63.4%65.4%66.8%68.1%
R & D costs105.3376.41,041.12,200.64,053.9
Sales costs75.8282.3780.81,711.63,219.3
Administrative costs50.5171.1416.4916.91,669.2
Financial costs8.442.8104.1244.5429.2
Total profits6.1211.61,061.03,098.26,856.1
Income tax costs0.931.7159.1464.71,028.4
Net profit5.2179.8901.82,633.55,827.7
Net interest rate1.2%10.5%17.3%21.5%24.4%

Table 5-15. Simplified balance sheet projections for the baseline scenario (passed balance checks).

Projects (millions of dollars, end of year)20302031203220332034
Monetary funds9,483.98,800.67,672.46,372.96,164.9
Accounts receivable311.61,124.92,995.06,531.511,759.9
Inventory28.8103.0296.2666.41,252.4
Net fixed assets166.8235.3443.5932.51,886.4
Total assets9,991.110,263.811,407.114,503.321,063.5
Accounts payable36.0128.8370.3833.01,565.5
Capital collection and capitalization14,500.014,500.014,500.014,500.014,500.0
Undistributed profits-4,544.8-4,365.0-3,463.2-829.74,998.0
Total liabilities and equity9,991.110,263.811,407.114,503.321,063.5

The balance sheet revealed two key points. First, accounts receivable expanded from $3.12 million in 2030 to $117.6 million in 2034, accounting for 49.3 per cent of operating income and 55.8 per cent of total assets in the year - a proportion that is highly similar to the situation before Dean ' s diagnosis was put on the market and that is the subject of due diligence and scrutiny. Second, the undistributed profits were covered in 2034 by a negative correction (8297,000 yuan), i.e., cumulative losses; this point is material to subsequent declarations, as some of the listed routes have clear requirements for accumulated uncompensated losses.

Table 5-16. Summary of cash flow statement for the baseline scenario.

Projects (thousands)20302031203220332034
Net profit5.2179.8901.82,633.55,827.7
Add: amortization of depreciation8.434.2104.1244.5476.9
Less: Increased operating funds304.4794.71,821.83,444.05,081.9
Net cash flow from operating activities-290.8-580.7-815.9-565.91,222.8
Net cash flows from investing activities-175.3-102.6-312.3-733.5-1,430.8
Free cash flow-466.1-683.3-1,128.3-1,299.5-208.0

Three tables were put together to see what was easy to ignore: The profit statement showed that the profits had been earned in 2030, the balance sheet showed that the accumulated losses had not been compensated until 2034, and the cash flow statement showed that the operating cash flow had not changed until 2034 and the free cash flow had not changed until 2035. The same company's three forms give three "go-time" points, four to five years. Looking at the profit statement alone leads to the wrong conclusion that "no more financing will be required after 2030" -- which is the most common miscalculation of the IRD early project, and is the direct basis for our characterization of Round A as "operating funds advances".

5.6.5 Balance of gains and losses, cash flow paradox and operating capital

Book balance: 276-490. Based on the fixed operating cost of 12 million yuan/year (comparable to approximately 35 people ' s team, quality system maintenance, registration maintenance and channel base inputs), the number of installed units in use to cover the fixed cost is as follows.

Table 5-17. Number of installed stations required to balance the book gains and losses (70 per cent of gross fuel consumption).

Single annual card consumption (one sheet)Single annual Maori contribution (thousands of dollars)The balance of gains and losses is being used for loading (station)Corresponding year ' s consumption income (millions of dollars)
3502.454901,715
4503.153811,715
5503.853121,716
6204.342761,711

Here's a caliber that has to be made clear: the balance of gains and losses is determined by the use of "loading" instead of "cumulative drop" and the number of stations is heavily dependent on annual card consumption. If the consumption of cards rises from 350 to 620, the number of machines required to balance gains and losses will drop from 490 to 276, a 44 per cent reduction. § 3.6.2 This confirms the judgement of Lesson 1 - calorie consumption is a more critical operational indicator than the number of installed stations and a product design and scenario SOP should prioritize optimization.

The cash flow paradox: the faster the growth, the larger the gap. Under DSO conditions of 180 - 270 days, the amount of $0.49 - $0.74 per dollar of additional income is immediately taken into account; The increase itself consumes cash when the rate of increase is higher than the rate of repayment. The cumulative cash gap peaks in the three scenarios at $68.06 million (conservative), $83.35 million (baseline), $116.82 million (optimistic) - the better the business, the more financing is needed. This is not a model flaw, but rather a true pattern of testing of government and public institutions. Dean's diagnosis was directed to the same structure before the listing, the difference being that it was financed through IPO funding, and Byegerm had to cover the gap in the Pre-A and A rounds, or else it would fail with a high rate of income growth as a result of cash fractures -- the most typical growth death in the IVD industry.

Tables 5-18. Sensitivity in the number of days of turnover of accounts receivable (base scenario)

DSO (days)Receivable in 2032 (in thousands)Percentage of current year ' s incomeReceivable occupation in 2034 (millions of dollars)Percentage of current year ' s income
2703,85174.0%17,64074.0%
2403,42365.8%15,68065.8%
2102,99557.5%13,72057.5%
180 (baseline end)2,56749.3%11,76049.3%
1201,71232.9%7,84032.9%
90 (after factoring)1,28424.7%5,88024.7%

Introduction of accounts receivable factoring, pushing DSO to 90 days, could release approximately $17.12 million in operating funds in 2032 and approximately $58.8 million in 2034; The annual cost of $4.7 million in exchange for the cash release of $58.8 million is a clearly cost-effective transaction under round A - this is why the financial cost rate is around 2 per cent in tables 5-10. The corresponding action was to pre-empt the signing point of the factoring framework to the Pre-A stage, rather than to wait for cash stress.

5.7 Investment Returns and Exit

5.7.1 Net present value and investment recovery Period

The cash flow sequence is: pre-commercial inputs in 2026-2029 (total - $45.5 million) + free cash flows in 2030-2034 + withdrawals in 2034 (in PS multiples of Table 5-10). The discount rate is set in five tranches to cover the required rates of return for different types of investors.

Table 5-19. Analysis of net present value (three scenarios x five tranche discount rate).

Discount rateConservative scenario (millions of dollars)Baseline scenario (thousands of dollars)Optimistic scenario (thousands of dollars)Subject applicable
12%13,52042,644121,876Industrial capital
15%10,38933,93097,992Industry/Government-led funds
20%6,61423,32268,812Early Medical Devices Fund
25%4,08416,10748,857VC Common Minimum
30%2,37111,13235,012High-risk discount

The three scenarios are positive under the overall five-tier discount rate, indicating that the project has an investment value within a reasonable risk pricing. But the absolute value of NPV is highly dependent on the exit-to-price assumption of 2034: under conservative scenarios, with a 30 per cent discount rate, NPV is only $23.71 million and the security margin is thin. This means that the feasibility of the exit path (§ 5.7.3) is more of concern than the NPV values themselves.

The same is true for the investment recovery period: from 2026 onwards, the static recovery periods for the three scenarios were about 8.1 years, 8.1 years, and 8.0 years, all of which occurred in 2034, and were achieved by withdrawal from the value of the price, rather than by operating cash flows. This is the same two formulations as the cash flow paradox of § 5.6.5 - the project remained in net cash consumption until the withdrawal occurred. The meaning for investors is clear: This is a typical exit-driven investment with no cash dividends in transit. It is more efficient for both parties to write this point in a business plan, rather than waiting for investors to figure it out themselves.

5.7.2 Intended rates of remuneration and returns in turn

Table 5-20. Remuneration rates at the project level.

IndicatorsConservative scenarioBaseline scenarioOptimistic scenario
Withdrawal from valuation in 2034 (millions of dollars)45,239119,232319,519
PS multiples3.5×5.0×6.5×
Project IRR43.5%67.6%95.2%

By rotation (12 per cent Seed round, 8 per cent seed + wheel, 18 per cent Pre-Series A round, 22 per cent Series A round) and taking into account subsequent rotations, the returns for each round of investors when they exited in 2034 are as follows.

Table 5-21. Investment returns in turn (three scenarios).

RoundYear of investmentInvestment (millions of dollars)Conservative scenarioBaseline scenarioOptimistic scenario
Seed round20267004.6× / IRR 20.9%12.0× / IRR 36.5%32.2× / IRR 54.4%
Seed + Wheel20278002.9× / IRR 16.4%7.6× / IRR 33.7%20.4× / IRR 53.9%
Pre-Series A round20283,0002.1× / IRR 13.3%5.6× / IRR 33.2%15.0× / IRR 57.0%
Round A202910,0001.0× / IRR -0.1%2.6× / IRR 21.3%7.0× / IRR 47.7%

One thing must be clear to the A-wheel investors: in a conservative scenario, the A-wheel returns are 1.0 times, and IRR is about zero. This result should not be hidden; rather, it is the basis for the design of the investment clause - the A round has significantly higher downside risk than the earlier round, and there is a valid claim for liquidation priority, anti-dilution clause and performance bet. We will take the initiative in the negotiations to present this measure in exchange for a more reasonable valuation and easier repurchase trigger. Putting risks on the table would be far more advantageous than waiting for the other party to be counted.

At the same time, we have drawn three boundaries between the terms of gambling and repurchase:

The subject of the repurchase obligation is the company, not the founder, who bears unlimited joint and several responsibility. The individual solvency of the student start-up team does not cover the scale of Round A and acceptance of an unlimited chain of individuals is legally valid, but in reality constitutes a substantial destruction of the founders and an obstacle to subsequent financing.

Indicators of gambling should be tied to controllable matters. The number of data-service payment contracts for the completion of the Regional Repurchase Rate Targets is an impact that teams can influence by their efforts; and the "realization of net profits X million dollars for a given year" is dominated by the rhythm of the collection policy and fiscal disbursement and is not an appropriate indicator to trigger repurchases.

Repurchase triggers should have a remediation period and a phasing arrangement. The granting of a 6-12 month remedial window to the company and the granting of instalments to avoid single-point cash shocks would lead directly to the liquidation of the company, which would also be a better outcome for the investor itself.

5.7.3 Withdrawal mechanism

The exit path should be judged not on untested expressions such as "marketable in the future" but on the actual entry threshold for individual plates. The following table is based on the sample of enterprises (total of 64) processed in 2026 on the boards of the A shares.

Table 5-22. 2026. Portfolios of business evidence (samples n = 64) are received in sections of A shares.

BoardNumber of samplesMedian net profit (thousands of dollars)Minimum net profit (thousands of dollars)Number of entrepreneurs in deficitMedium proposed (billions of dollars)
The main panel.647,23126,381017.91
Deep Master526,34319,564011.50
Businessboard2411,302-8,405210.00
North China148,2495,11203.57
Science Board15-7,971-116,388925.03
Full sample6411,442—1111.25

Three conclusions that can be directly used: The board is the only one that substantially admits unprofitable enterprises (9 out of 15 samples) with the highest median amount proposed for fund-raising; The evidence threshold is lowest, but a profit is required, with a net profit of 51.12 million yuan in the sample and a median of 82.49 million yuan in the sample, with no loss; The empirical threshold for the board is between 200 million and 470 million yuan net profit, which is not realistic for Bygerm in the foreseeable time window.

We also need to see where Bygerm is in the non-profit medical enterprise. In 2025, a subset of medical devices and biomedicine in a sample of science boards accepted showed that the typical picture of unprofitable enterprises was: business income of 0.5 per 100 million yuan, annual net loss of 150 million yuan, and research and development personnel of 25 per cent per 36 per cent. This picture is fundamentally different from Byegerm, whose huge losses come from the capital consumption of clinical trials and the development of innovative medicines, while Bygerm ' s model is the early repurchase of materials that generate positive Maori, with losses much smaller than those of such enterprises and a lower income start than its financing tempo. In other words, Bygerm is in the middle of "not having a single-pound product that supports high market value, like a non-profit innovation drug, nor having significant absolute profits like a mature IVD company." This is the premise that exit path design must be addressed.

Table 5-23. Panel selection decision matrix (projected values x empirical threshold).

PathEvidence thresholdBygerm TimepointDecision
Merger exitWithin industry PS 3.5–6.5 times2033-2035 enforceablebase path. For Series A round investor, it's the only way to get out within a reasonable window of time.
IPO NorthMinimal net profit: $51.12 million / median: $82.49 millionBaseline scenario Net profit for 2034 58.28 million yuan exceeded the lowest value; 2035-2036 is required to reach the medianThe most realistic IPO path. But the median number of fund-raising is only $357 million, with limited capacity for A-wheel investors.
IPOMedium net profit: $113.02 millionOptimistic scenario: 2034 (124.3 million yuan); baseline scenario after 2036Possible but time-to-time and continuous profit record and one more year delay in submission
IPOAt the core of the projected market value, it usually requires a level of 4 billion.Baseline scenario Quits the valuation in 2034 £1.19 billion, optimistic scenario £3.1.9 billion, none of which reached that level.It's not realistic at this stage. It's an upper path that needs to be triggered by additional conditions.

The honest conclusion is that, in three scenarios, Byegerm was unable to reach the market value level required by the non-profit standard of science and technology by 2034, or to meet the profit threshold of the board in a stable manner. So we have the exit from M&As as the baseline exit path, the preferred IPO path in the North, and the science board as the top path that requires additional conditions to trigger. It's more convincing to put this judgment in a business plan book than to write "The future will be on the board" -- the first is to say that the team understands capital market rules, the second is to say that the team has not checked the data.

What are the additional conditions to trigger the science panel path? In terms of valuation composition, the current pricing logic for Bygerm is "IVD materials manufacturing" (PS 3.5–6.5 times). To leap to a 4 billion-bit scale, the pricing logic needs to be changed to a "public health data infrastructure" -- which requires that the ratio of data to service income rises from 8 per cent to more than 25 per cent of the current model, and that data services result in independent renewable payment contracts rather than hardware grants. That's why we classified "Data Services at 25%" as level I KPI (§ 4.1): It is not just a gain path, it is a valuation logical switch.

Table 5-24. Five exit paths and their trigger conditions.

Exit modeApplicable ObjectTimePricing benchmarksTrigger condition and preposition
Industrial mergers and acquisitionsAll shareholders (baseline path)2033–2035PS 3.5–6.5 times the equivalent of 4.5–3.2 billion yuanIVD listed companies buy to supplement out-of-house and grass-roots channels. Preparation: registration ready, financial regulations, clarity of IP tenure, decentralized triple concentration
IPO NorthAll Shareholders (IPO preferred)2035–2037Reference to the rate of earnings of North Korean workersContinuous profit record is required. Preparation: since 2033 to regulate financial and internal controls in accordance with the standards of listed companies, purchasers to be consulted on listing
Old stock transfersSeed wheels, seeds + wheel investorsRound A or B10 per cent to 20 per cent per round valuationA Round investment clause to provide intermediate liquidity for early investors
Management/strategic buybackWhen you trigger a bet clause2032–2034Principal plus annualized 8-10%As the next line of protection. The repurchase obligation is incumbent on the company and requires a remediation period and phasing arrangement
IPOAll shareholders (uppath)After 2036Valuation logic centred on projected market value25 per cent of income from data services required to form independent fee-paying contracts to achieve a logical change in valuation

Table 5-25. Risk capital exit time nodes.

TimeStage eventsCorresponding exit actionsIf no response is reached
2029A RotationOpening old stock transfer routes for seed wheels, seeds + wheel investorsEarly investors continue to hold M&A windows until 2033
2030Acquisition of registration and realization of first-year commercialized revenuesValuation revaluation, trigger B round or strategic investment negotiating windowOne year delay, Pre-A synchronized with A Round Investors Duration
2032Break-through of the profit-and-loss balance line with installed machines (276-490)Start potential M&A contacts and enter the watch listRemedial arrangements for initiating repurchase clauses if the installation fails
2033Accumulators 2,300 units, over billions.Merger window opened, valuation reference PS 3.5–6.5 timesTurning into business, waiting for the 2035 North Vietnamese declared window
2034Cumulative losses covered, operating cash flows positiveM & A exit from the best window; with financial conditions to start the listingRegulate financial and internal controls by North Transit route if M&A is not completed
2035–2037Continuous profit record formationIPO declaration and issuanceReturn to M&A if profit records are interrupted
After 2036Data service income 25%Science-based path assessment (upside options)Maintenance of the northern junction path

5.8 Data classification, model limitations and commercialization closure Ring

To avoid secondary data contamination, we have a three-tier hierarchy of external data used in this chapter, and the financial model only allows the use of A and B data;

Table 5-26. Data validation level three.

LevelDefinitionsUse allowedTreatment
ASpecific sections of the original disclosure document can be located (unit statements, responses to queries, periodic reports) and are accompanied by information networks or exchange announcements Chain Answer.Parameter calibration, financial modelling, valuationDirect reference and registration of verification lists
Level BOpen research from named third-party institutions, base year and clear calibreIntersectional parameters, trend judgementMark the institution and base year with only the upper and lower limit
Level CFigures from non-retroactive, unknown calibre or repeatedNot for any calculationRemoved, or rewritten as qualitative and labelled Wait. Nuclear Check

§ 5.5 to § 5.7 All of the figures produced by Bygerm itself are derived from the parameters of Table 5-10, which are fully recalculated endogenous data and do not rely on external references; The entries requiring external validation are concentrated in the two categories of operational data for the target company and listing rules, which we use as a basis for public disclosure documents by the Mega Tidal Information Network and the Exchange, with original links attached to the final submission. In particular, one of the listing rules is to point out that the third set of criteria for listing unprofitable enterprises and entrepreneurship boards has undergone several adjustments in recent years. Table 5-23, “Billion dollar market value scale”, is based on the approximation of general awareness and is updated in the original listing rules in force in the exchange prior to formal disclosure.

There are three limitations to the model itself, as we have indicated. First, the operating data of the five comparable companies are derived from their historical time and regulatory environment and are not fully comparable to the market conditions that Byegerm faces in the future; we use only its structural ratio and failure model and do not directly use its absolute values. Second, the full projection is based on the premise that the registration of evidence will be completed by 2030, and that if the registration cycle is significantly extended, the cash flow will move back as a whole, and the model will need to be re-run rather than simply extrapolated - it is estimated that every year the starting point for commercialization is postponed, the project IRR falls by about 8-12 percentage points. Thirdly, the threshold of the exit route is based on the accepted sample from 2025 to 2026 and the listing rules at that time, which must be verified before submission at the aforementioned calibre. These three limitations do not weaken the conclusions of this chapter, but define the scope of application of the conclusions - a financial projection that claims to be established under any condition is precisely the least credible.

The commercialization logic of Byegerm is therefore a complete closed loop: a list of competencies, team strengths and weaknesses, a five-ring four-stream division of labour, a milestone finance, a complex business model, a recalculated financial forecast, a clear exit path. Each section is not an isolated presentation, but a binding input for the next section; each resource requirement has a specific bearing, each fund has a verifiable release, and each number can be calculated by the reader using the same parameter table.

6. Long-term Impacts

6.1 Positive Long-term Impacts

The long-term impacts of Byegerm should be discussed among the target audiences and different stakeholders would benefit from the technology in different ways.

For Vulnerable Individuals

For the elderly and children, Bygerm can reduce unnecessary waiting, referral and oversegregation, and can reduce detection fear through more friendly sampling. This value has been quantified in our IHP certification - 94% of children who use the sampler do not show resistance, and 89% of the elderly give a good rating in blind operations that do not depend on sight.

For Care Institutions

For eldercare facilities and kindergartens, Bygerm can help managers to make quarantine, referral, notification of family members and retest decisions faster and reduce the operational pressure of one-size-fits-all seals. One of the concerns raised by the director of a nursing home that "a common cold has evolved into a whole floor infection within a week" was the specific pain that was to be overcome at the level of the Bygerm scene. From an institutional economic point of view, the cost of avoiding a building-level clustering of infections in terms of family compensation, closure, and repair of public opinion amounts to $500,000 per one-time, which constitutes a clear reason for Bygerm to pay for the retirement home.

For Healthcare Providers

For primary doctors and fever clinics, Bygerm can assist in the initial screening of respiratory infections, help to distinguish the risks of different pathogens, and provide a basis for rational use, referral and further examination. Considering that WHO classified anti-microbial drug resistance as a major public health and development threat and estimated that bacteria AMR had directly caused 1.27 million deaths and related deaths in 2019, 4.95 million cases were also of reasonable use of antibiotics to assist in field testing that distinguished viruses from bacterial infections. That was the central reason why Vice-President Koo suggested that we should include pneumococcus in 4+1 Panel.

For Public Health

Bygerm can be a more intensive and dispersed sentinel for the system. The consolidated compliance data help to detect anomalies earlier and support regional public health responses. In the long term, each of Bygerm's devices is a "distributive public health sensor" -- the ability of a single central laboratory to achieve no amount of additional flux.

For iGEM and Synthetic Biology

For the iGEM community, Byegerm demonstrates how synthetic biology projects move from laboratory prototypes to real social needs: rather than pushing technology to the market, it is constantly reshaping technology in client detection, expert feedback and accountability governance. We have settled the two-point technology transfer process, stakeholder interactions, and compliance model cases to iGEM Wiki in full, hoping to develop a similar focused scenario for the global iGEM team, providing a replicable paradigm that combines biosafety compliance, technical location effectiveness and multi-stakeholder synergies.

6.2 Potential Negative Impacts

Responsible innovation requires that we confront the potential negative effects of technology rather than show positive benefits. The main negative risks identified include:

Fake negatives lead to leakage: may create a false sense of security for institutions and families.

Hypothetical positives lead to over-reaction: they can trigger unnecessary containment, parental panic or waste of medical resources.

Data compliance risk: Insufficient sensitivity or unclear reporting paths may result in privacy disclosure.

Fuzzy boundaries of responsibility: Grass-roots institutions may make key decisions based on primary screening without medical confirmation.

Environmental burden: one-time materials increase the amount of medical waste.

Dependency risk: Institutions over-reliance on a single testing tool, neglecting other public health measures.

6.3 Governance and Mitigation

In response to the above-mentioned potential risks, Bygerm has established four-tier governance mechanisms:

Data Governance

Priority local encryption, desensitization before uploading, minimum necessity, clear authorization and withdrawal mechanisms; [S16]

Clinical Governance

(d) Standardized training certificate for primary care staff.

Operational Governance

The institutional side SOP is clear as to "what circumstances do not depend on Bygerm's results" - for example, severe disease recognition, prolonged bed rest, low immunization, etc., are still clinically judged.

Environmental Governance

(a) Closed card box + in-situ self-destruction + modular transport + note plastic mass production process, whereby the environmental footprint of the disposable material is controlled throughout the life cycle of the product;

6.4 Future Vision

Byegerm ' s long-term vision is not just to be a respiratory detection device, but to be part of grass-roots public health capacity.

In the short term, Byegrem will provide rapid multi-pathogen screening for nursing homes, kindergartens, primary care and fever clinics. In the medium term, Byegerm will be extended to CDCs, ports and regional public health networks, creating a more systematic trend monitoring capacity. In the long term, Byegerm can expand from respiratory pathogens to more infectious diseases, from single-point testing to a regional level, from equipment sales to an integrated service ecosystem of "test-data-training-public health response".

Ultimately, we want Byegerm to answer more than "how to detect a pathogen", but rather: how to really get synthetic biology into the grass-roots scene where it is most needed and increase social resilience in a affordable, manageable and sustainable way.

7. References

(1) Integrated Human Practices Wiki: Model for stakeholders, Power-Interest quadrant analysis, double-point construction records, full records of over 30 expert interviews, data on interactive tools for collaborative engineering (102 blinding old people, 50 child stickers voting, 200 retrospective questionnaires).

(2) Education Wiki: HEART-Edu Loop framework, high demand/sub-demand/special needs groups SOP, GitHub open source repository links.

(3) Project Design Design Design Design: RPA-CRISPR Five Targets Document, microfluidic Chip SolidWorks Model, Training Log for YOLOv8 Interpretation Model, Third Party Blindness Recurrence Report.

(4) Market and industrial data: Iri consulted China's PACT Industry Study 2024; QYResearch, Global and China's PACT Molecular Diagnosis Market Report 2025; Allied Market Research, Global Insurance Division Diagnostics Market 2019-2027; League of Nations Research Institute for Securities, Economics and Industry, Research in Respiratory Pathology Inspections; and AIDS consultant, China Infant Care Market Operation Data and Trends Report 2025-2026.

(5) Policies and regulations: "Health China 2030" Programme Framework; "XIV5" National Health Plan; "Guidance on the Comprehensive Promotion of Close District Health Community Building" (2023) (d) The Regulations on the Registration and Documentation of Medical Devices (General Directorate of Market Supervision Decree No. 47); [S4] [S6] [S7] [S11] [S14] [S15] [S16]

(6) Academic literature: CRISPR diagnostics overview (PM967495; PMC 10340307; ebiotrade 2026/01); DETECTR/SHERLOCK original literature series (Science 2018); CARMEN Multiple Testing Method (Nature 2020); CARMEN-Cas12a Array Space Flowing Principle (Nature Communications). [S8] [S9] [S10]

(7) Financial matching and capital market data: statement of account for the Da ' an gene (002030.SZ), Dian ' s diagnosis (300244.SZ), Manfu (300482.SZ), St. Vincent ' s (688289.SH), Novizan ' s (688105.SH), responses to queries and periodic reports (GTONET); [S19] [S20]

7.1 Authoritative sources and retroactive tables

The following table is used to trace new or reinforced factual statements. (a) Commercial measurement and team IHP data for market size should still be accompanied by the original report, questionnaire data sheets and interview minutes with the final submission;

Data table 42
NumberingSources of authorityContent to supportLink
S1WHO:Seasonal influenza fact sheetSupporting the public health context of seasonal influenza cases, severe diseases and the burden of death.
S2WHO:Respiratory syncytial virus (RSV) fact sheetSupport the RSV presentation on the burden of hospitalization and death for children under five years of age.
S3Ministry of Civil Affairs, National Office for Ageing: 2024 National Ageing Development BulletinAt the end of 2024, the population aged 60 years and over and 65 years and over was supported by the size and proportion of the population.
S4National Commission for Health and Welfare, among others: Guidance on the Comprehensive Promotion of Close District Health Community DevelopmentIn 2025, more than 90% of the districts were basically built, and in 2027, they were largely fully covered.
S5National Commission for Development and Reform: National Plan for the Development of Ageing and the Old Age ServiceThe total number of beds for old-age care in 2025 reached the planned target of over 9 million.
S6National Health Commission: "Health China 2030" Planning FrameworkPolicy formulation to support the improvement of early warning mechanisms for the monitoring of infectious diseases and the system for preventing and controlling infectious diseases at ports.
S7National Commission for Health and Welfare: Indicators for Professional Medical Quality Control of Infectious Diseases (2023 edition)Indicators supporting quality control of diagnosis of infectious diseases and pathological diagnosis.
S8Science:DETECTR / Cas12a DNA detectionSupporting the CRISPR-Cas12a diagnostic technology base.
S9Nature Protocols / PMC:SHERLOCK nucleic acid detectionSupporting nucleic acid detection methods that combine CRISPR with thermostats.
S10Nature:CARMEN-Cas13 multiplex pathogen detectionSupporting the idea of multiple pathogen detection and CRISPR diagnostic platform.
S11Ministry of Justice: Procedure for the registration and filing of in vitro diagnostic reagents (General Directorate Decree No. 48)Supporting the IVD registration/recording basic system.
S12National Drug Authority: medical equipment registration and record keeping managementSupport the registration of medical devices and controllable requirements.
S13NDA: YY/T 0287-2017 / ISO 13485Support for quality management system requirements for medical devices.
S14National Internet Information Office: Personal Information Protection ActSupport compliance with personal information, sensitive personal information processing and delegation of authority.
S15National legal and regulatory database: data security legislationData security compliance floor supporting health data processing.
S16National Standard Information Public Service Platform: GB/T 397225-2020Standard information to support health medical data safety guidelines.
S17General Directorate of Market Supervision: Criteria for the review and publication of medical equipment advertisementsSupporting the advertising of medical devices to promote boundaries and censorship requirements.
S18State Council: Regulations on medical waste managementSupporting responsibility for infectious medical waste management and disposal.

The new financial and capital market component of this edition corresponds to two complementary sources: S19 - Public Disclosure Documents (Indications of Equity, Audit Query Responses, Periodic Reports) for the Corporation's Māori rate structure, cost rate, accounts receivable share and concentration; S20 - Public Information for the Distribution and Review of Public Information and the Existing Listing Rules of the Beijing Stock Exchange, for sample statistics and plate entry threshold determination. Both are A-level data as defined in Table 5-26 and are eventually submitted with the original link.